background image

9

FIGURE 27 - ROUTING FIBERS FROM THE

OFFICE BUFFER

12.08

Route fibers 1-12 of the field buffer tube
1-1/2 times counter-clockwise around the

splice tray entering the upper splice block from the
right side.  Route fibers 13-24 of the field buffer tube
1-3/4 times counter-clockwise around the splice tray
entering the lower splice block from the left.
 (Figure 28)

FIGURE 28 - ROUTING FIBERS FROM THE

FIELD BUFFER

12.09

Splice fibers according to accepted company
practices.

tray. Insert the tail into the head.  Press head
down to the tray and hold in place while pulling
the tail to tighten the tie wrap.

FIGURE 26A - INSERT TIE WRAPS

FIGURE 26B - POSITION AND SECURE

BUFFER TUBES

12.07

Route fibers 1-12 of the office buffer tube
1-1/4 times clockwise around the splice tray

entering the upper splice block from the left side.
Route fibers 13-24 of the office buffer tube 1-3/4
times clockwise around the splice tray entering the
lower splice block from the right.  (Figure 27)

Содержание Coyote HiCount

Страница 1: ...ES FOR FIELD DRILLED END PLATES 5 6 8 END PLATE ASSEMBLY 6 7 9 BONDING AND OR GROUNDING CABLES WITH METALLIC COMPONENTS 7 CONTENTS PAGE Be sure to read and completely understand this procedure before...

Страница 2: ...s Common screwdriver 1 2 deep well socket 3 8 nutdriver or socket Needlenose pliers Buffer tube removal tool and or slitter Sidecutters Torque Wrench inch pound readings Power End Plate Cutter Availab...

Страница 3: ...easure each cable at the area where the End Plate is to be placed 4 00 END PLATE PREPARATION CUTTER SET UP 4 01 When using blades A D install the blade directly into the chuck For blades E DD first in...

Страница 4: ...ck shaft PLP TIP A special drill motor is available from Preformed Line Products No matter what type of electric drill you use be sure to press down on the body of the drill so that pressure is not ex...

Страница 5: ...m a LOCK TAPE Sealant strip to dry and remove excess C Cement applied to End Plate Figure 13 FIGURE 13 C CEMENT ON END PLATE 6 04 Without stretching apply LOCK TAPE Sealant over prepared surface of th...

Страница 6: ...END PLATE ASSEMBLY 8 01 Using the hex bolts provided fasten the L bracket and retaining clip to the End Plate 8 02 Before installing prepared cables into End Plate halves apply 1 4 6 35 mm wide bead...

Страница 7: ...et through the slot pro vided 9 03 If cable contains a strength member insert the strength member into the retainer clip and tighten Cut off excess strength member 10 00 INSTALL ORGANIZER ASSEMBLY 10...

Страница 8: ...MOVE SPLICE TRAY COVER 12 03 Position the back splice tray on the Splice Tray Rack and route the buffer tubes into the LEFT corner of the splice tray Mark the buffer tubes just beyond the tie down hol...

Страница 9: ...ERS FROM THE FIELD BUFFER 12 09 Splice fibers according to accepted company practices tray Insert the tail into the head Press head down to the tray and hold in place while pulling the tail to tighten...

Страница 10: ...First Then Finally Hand Tighten in Sequence with Ratchet All 1 Bolts First Followed by all 2 Bolts and so on Torque Each Bolt Following the Sequence to 125 in lbs 14 N m 90 in lbs 10 N m for 4 Closur...

Страница 11: ...and grounding harness of the manhole Securely tighten all connections 16 03 For direct buried installations extend a length of bonding ribbon not supplied from one of the threaded inserts to a ground...

Страница 12: ...uct is intended for use by trained craftspeople only This product SHOULD NOT BE USED by anyone who is not familiar with and trained in the use of it 18 04 When working in the area of energized lines w...

Отзывы: