© Precor Incorporated, Unauthorized Reproduction and Distribution Prohibited by Law
Page 133
Preventative Maintenance Checklist (Facility personnel)
(To be done by the facility personnel)
To Be Done Daily:
Turn off and unplug the unit.
Visually inspect the deck and belt.
Wipe down the deck and belt with a dry cloth.
All outer surfaces of the unit are clean
Inspect the power cord.
To Be Done Weekly: All of the above plus
Elevate the unit to maximum incline and remove power.
Totally clean the environment around and under the machine.
Re-connect power and turn the unit on.
Perform the "Running Belt and Deck Cleaning Procedure"
To Be Done Monthly: All of the above plus
Remove the power from the unit.
Clean the outer surfaces of the unit, and scrub the top surface of the belt.
Содержание TRM10/GEN06
Страница 2: ......
Страница 23: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 21...
Страница 93: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 91...
Страница 139: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 137 Exploded View...
Страница 140: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 138...
Страница 141: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 139...
Страница 142: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 140...
Страница 143: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 141...