![PRECISION DIGITAL Helios PD2-6100 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/precision-digital/helios-pd2-6100/helios-pd2-6100_instruction-manual_1594072032.webp)
Helios Large Display Strain Gauge Meter Instruction Manual
PD2-6100
32
Calibrating the Meter with Strain Gauge/Load Cell (
Cal
)
Note: To scale the meter without a
signal source refer to
The meter can be calibrated to display the process variable in engineering units by applying the
appropriate input signal and following the calibration procedure.
The use of a calibrated signal source is strongly recommended to calibrate the meter.
Warm up the meter for at least 15
minutes before performing calibration
to ensure specified accuracy.
Multi-Point Calibration & Scaling
The meter is set up at the factory for 2-point linear calibration. The number of points for multi-point
calibration/scaling is set up in the
Advanced
Features
menu. Up to 32 linearization points may be
selected for PV1 and up to 8 linearization points may be selected for PV2. See page 52 for details.
www.
GlobalTestSupply
.com
Find Quality Products Online at: