ENGLISH
2.
Take off the front panel, and connect the battery terminal (A) from UPS to EBM terminal
(B) shown as below. And then connect the battery terminal (D) from the first EBM to the
battery terminal (E) from the second EBM. Users need to remove the small gate(C) on side
of the front panel to allow the outlet wire of the EBM to pass through the gate and then
reassemble front panel.
Note:
Three or more EBMs can be connected to the UPS in the same way as shown above.
VII.
Replacing UPS Internal Batteries
Follow the steps and Charts as below to replace batteries:
1.
Take off the LCD box, and remove the
screws.
2.
Slide and Pull the front panel leftward
and then take it off.
E
B
C
A
D