4-2
Figure 4-1. Removing the Shipping Bracket
6. Slowly roll the cabinet toward the front of the pallet. Continue rolling the cabinet down the ramp until the
cabinet is clear of the ramp (see Figure 4-3).
7.
Roll the cabinet to the final installation location.
8. If installing the cabinet permanently, retain the shipping brackets and hardware; otherwise, recycle the
pallet, ramp, and shipping brackets in a responsible manner.
9. Secure the UPS cabinet in position by lowering the leveling feet until the cabinet is not resting on the
casters and the cabinet is level.
10. If permanently mounting the system, proceed to Step 11;
11. Using the retained hardware, reinstall the shipping brackets removed in Step 2 and Step 5 to the front and
rear of the UPS cabinet with the angle facing outward (see Figure 4-1).
12. Secure the cabinet to the floor with customer-supplied hardware.
Pallet
Front Door
Shipping Bracket
Shipping Bracket Bolts
WARNING
Do not stand directly in front of the pallet while unloading the cabinet. If unloading instructions are
not closely followed, the cabinet may cause serious injury.
Содержание VFI 20000-40000TAP 3/3 BI
Страница 2: ......
Страница 4: ......
Страница 8: ...iv This page intentionally left blank...
Страница 10: ...vi This page intentionally left blank...
Страница 12: ...viii This page intentionally left blank...
Страница 18: ...1 6 This page intentionally left blank...
Страница 21: ...Section 1 Installation...
Страница 22: ......
Страница 46: ...This page intentionally left blank 3 24...
Страница 64: ...4 18 Notes...
Страница 65: ...Section 2 Operation...
Страница 66: ......
Страница 100: ...This page intentionally left blank 7 2...