
2/8
Fig.1-2 Controller Interface Definition
1.3 Wiring and Grounding
We must prepare the system grounding project, please a qualified electrical engineer to be construction. Product is energized and
ready for use; you must ensure that the power outlet the AC input is securely grounded. The grounding wire is yellow and green lines,
it must be connected to the grid and reliable security protection on the ground to ensure safe use, and prevent abnormal situation.
:
All power lines, signal lines, ground lines, wiring not to be pressed into other objects or excessive distortion, to ensure safe
use!
2 Operation Panel Instructions
2.1
Operation Panel Display Instruction
Fig.2-1 Operation Panel
Key Functions
Key Name
Description
Parameter setting key
Use the key to switch to the program mode.The key is parameters confirm key, and back to
the previous menu until the operator sewing mode state. In addition, work with other key to
set a higher level of the parameter.
Parameter
modification key
Parameter to modify the confirmation key, press the
again to return to the standby
interface.
Start back tacking
setting key
Switch during all start tacking type when press the
key is lit. (No tacking, once tacking,
double tacking, 4 repeat tacking). Show
is start back tacking interface,default range
1~F corresponds to the 1~15 pin.