INSTALLING YOUR
PowerMate® LiftGate
F.
Secure the Base to the floor and the reinforcing steel with
3/8"-16NC Bolts, Washers and Lock Nuts.
STEP 3: Running
the
wires
CAUTION!!
The best and easiest way to route the wire from the Unit to the
vehicle battery is to follow the path from the rear lights. If this is not
feasible you must avoid the following:
I.
Any heat sources. EG. Exhaust system.
II.
Any pinch points. EG. Suspension system.
III.
Any areas that may cause chaffing to occur on the wiring.
G. The
BLACK
wire that exits the Base Assembly and is fed
through the floor must be fastened to a suitable Ground on
the vehicle frame.
H.
Slip a piece of Heat Shrink Tube over the
RED
wire.
I. Connect
the
RED
wire to the 6Ga. wire using the 6Ga.
Cable Splice and shrink the tubing over the connection.
J.
Provide a protective wire loom for the entire length of wire
installation including up through the floor into the Base
Assembly.
PowerMate
®
LiftGate™
Installation & Operation Manual
PN 018460 Rev.D2
Eng. 01/ 10/ 13
3.10
Содержание LiftGate LG-3
Страница 1: ...PN 018900 Rev E1 PN 389570 Rev E1 Eng 06 01 17 T20 080 08 ...
Страница 33: ...6 01 PN 081950 Rev D2 Eng 01 10 13 ...
Страница 35: ...PN018920 Rev D2 Eng 01 10 13 8 01 ...
Страница 36: ...PN 018940 Rev D2 Eng 01 10 13 8 02 ...
Страница 38: ...INTENTIONALLY BLANK ...