Maintenance and Repair
30
Sheave Installation
& Alignment
Before installing sheaves, make sure the chipper/shredder shaft and engine
shaft are clean and square or parallel to each other. This can be done by
using two large carpenter’s squares.
Assemble bushings into sheaves by leaving them loose, then slide them on
the shafts and install the key. Be sure to consider belt guard and cover
clearance.
Slide the sheaves on and off the shafts of the engine and chipper/shredder
body as needed to make sure they are in line. Use a long straight edge to
align them with each other.
Tighten all set screws evenly.
Tighten belts, keeping sheaves properly aligned.
Содержание M16620D
Страница 2: ...Hazard Signal Word Definitions 2 ...
Страница 7: ...Safety Labels 7 3 4 5 6 ...
Страница 8: ...Safety Labels 8 8 10 9 7 ...
Страница 35: ...16620 Parts Explosion Rev D 35 ...
Страница 43: ...43 This page has intentionally been left blank ...
Страница 44: ...44 Distributed by Northern Tool Equipment Co Inc Burnsville MN 55306 Made in China ...