17
4111-0078 — April 2017
OPERATION
Service Truck Leveler Safely
Whenever performing maintenance under the
truck leveler platform, support the platform with the
alternate means. Lock Out/Tag Out the power supply
with OSHA approved lockout/tag out device* (B&C).
Only the person servicing the equipment should have
the capability to remove the lockout/tag out devices.
The Tag out devices* must inform that repairs are in
process and clearly state who is responsible for the
lockout condition.
* Refer to OSHA regulation 1910.146. Confine Space
* Refer to OSHA regulation 1910.147. Lockout/Tagout
A— Operating Zone
B —Tag Out Device
C —Lock Out Device
When service under the truck leveler is required,
always lock all electrical disconnects in the OFF
position after raising the platform and support
by alternate means This alternate means may
include, but not limited to a boom truck, fork truck,
stabilizing bar or equivalent.
Always stand clear of the truck leveler when in
motion.
Always post safety warnings and barricade the
work area at truck level and dock level to prevent
unauthorized use of the truck leveler before
maintenance is complete.
O
p
e
r
a
t
in
g
Z
one
TOLERANCES
(UNLESS OTHERWISE NOTED)
FRACTIONAL:
1/32"
DECIMAL:
.00 =
.01"
.000 =
.005"
ANGULAR:
1
DRAWN BY
CHECKED BY
DRAWING NO.
DATE
BDK
4/24/2017
L o a d i n g D o c k E q u i p m e n t
P O W E R A M P
M C G U I R E
D L M
This print is the property of Systems, Inc. and represents a proprietary article in which Systems, Inc. retains any and all patent and other rights, including exclusive rights
of use and/or manufacture and/or sale. Possession of this print does not convey any permission to reproduce, print or manufacture the article or articles shown therein,
such permission to be granted only by written authorization signed by an officer or other authorized agent of Systems,Inc. thereof.
MATERIAL
STOCK NO.
ISO VIEW STORED
POSITION
SMTL - 65,000#
B
C
A
Содержание PowerLift
Страница 12: ...10 4111 0078 April 2017 Prepare Truck Leveler INSTALLATION FIGURE 1 FIGURE 2...
Страница 15: ...13 4111 0078 April 2017 INSTALLATION General Lay out actual product may differ from pictorial...
Страница 17: ...15 4111 0078 April 2017 INSTALLATION This page left intentionally blank...
Страница 23: ...21 4111 0078 April 2017 ADJUSTMENTS This page left intentionally blank...
Страница 26: ...24 4111 0078 April 2017 Controls Electrical...