Power 6ft Скачать руководство пользователя страница 15

 

 

 

 

Doors 

 

 

1.

 

Your shed will come with two doors which you will need to hang.  
The door with the lock on will go on the right (as you look at the shed from the outside) and the door with 
the shoot bolts will go on the left. 
 

2.

 

Position one of the doors in place ensuring the gap between the edge of the door and the shiplap tongue 
and groove cladding (which you will be screwing the doors in to) is approx. 5mm. This is the same for the 
top of the door where the gap should also be approx. 5mm.  
 

3.

 

Ensure that it is square and when you are happy with the position, secure the hinges in place using the 
25mm screws provided. 
 

4.

 

Repeat this process with the other door. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

5.

 

Choose a place above the door to secure your turn button.  
Be careful not to screw this too tightly or it will not turn. 

 

 

 

 

Page 14 of 18 

Содержание 6ft

Страница 1: ...ding Remove each panel by removing screws one column at a time as indicated below Be careful of loose components inside the pack when removing panels Check all the components against the checklist pri...

Страница 2: ...only The shed you ordered may be a different size or roof sloping other way Watch the video We recommend watching our installation video before starting assembly of your Power shed This video can be a...

Страница 3: ...Base Details Page 5 Components Checklist Page 6 Pre Assembly Page 7 Floor Page 8 11 Walls Page 12 Front Top Gable Page 13 Roof Page 14 Doors Page 15 Felt Page 16 Finishing Touches Page 17 Aftercare M...

Страница 4: ...nnot be held responsible for any damage or injury sustained due to incorrect unloading unpacking or assembly of any of our products Tools required not supplied Drill Spirit level Hammer Stanley knife...

Страница 5: ...will be access to all sides for maintenance work and annual treatment Remember not to place the base too close to any walls or fences as there may be a slight overhang on the roof which may come into...

Страница 6: ...panel vertically from the outside are the pieces of timber which are 12mm x 58mm thick Bargeboards which are for the edges of the roof although please carefully read the instructions where to put them...

Страница 7: ...quired Please use the table in the two previous few pages to view which components are required for the size you have ordered 2 Carefully remove the pallet and any untreated packing timber See the aft...

Страница 8: ...he floor panels together using the 50mm screws provided You can then turn the floor back the right way to create the full floor For 6x2 6x3 and 6x4 sheds the floor panel is in one piece 3 Screw the tw...

Страница 9: ...the gable end panels at the end sitting on the bearer for the 6x5 and 6x6 sizes and secure these panels together from the inside using the 50mm screws provided Use three screws per join Note For 6x5...

Страница 10: ...back wall and both ends are secured together leaving the front section open 6 Attach the one panel which goes at the side of doors called the door wings Again continue to use 50mm screws three screws...

Страница 11: ...the very outside edge of the floor see image below 8 You can then secure the other door wing using 50mm screws 9 Once the two panels are on which go at the side both sides of the doors door wings you...

Страница 12: ...gable walls through the floorboards and into the floor joists USEFUL TIP You can work out the position of the floor joists from the location of the existing nails in the floor If the upright framing...

Страница 13: ...r the back you can choose this as you assemble it 1 Add the pent front top to the side you want to be higher and screw to the panels below with 50mm screws Screwing upwards through the framing from th...

Страница 14: ...groove of the boards run as it will be covered by the felt and bargeboards 3 Make sure the framing on the roof is in line with the framing on the gable top so that the overhang on the front and back i...

Страница 15: ...e door and the shiplap tongue and groove cladding which you will be screwing the doors in to is approx 5mm This is the same for the top of the door where the gap should also be approx 5mm 3 Ensure tha...

Страница 16: ...for sufficient overhang to fold down onto the roof bargeboard but not the underside roof bargeboard Health and Safety Use Step Ladders to put on the roof felt but do not climb on top of the roof Ensu...

Страница 17: ...ner strips which are 58mm wide at each corner of your Power shed with 40mm nails at least four per strip Extra strips are provided to cover the joins between side wall panels 3 Secure the door pull to...

Страница 18: ...side Please ensure there are no overhanging branches or debris on the shed as this can lead to water ingress USEFUL TIP Looking for some inspiration Our Instagram has images of hundreds of Power Sheds...

Страница 19: ...gths down with a saw to fit depending on the shed you have 1 Choose an appropriate location for your shelving and screw the brackets to the internal framing of the shed with the 70mm screws 2 Use a sp...

Страница 20: ...on the cost we receive to you Any delivery surcharges you have paid such as a quicker delivery Saturday delivery or a timed delivery will not be refunded Once your item has been returned it will be c...

Отзывы: