OPERATING PROCEDURES

Do not operate until inspection and functional checks have been performed 
as specified below:

OPERATING PROCEDURES

 

It is the owners and/or the users responsibility to ensure that the machine is maintained 
and operated in accordance with the operation and maintenance procedures contained 
within this manual.

It is essential to be familiar with the correct operating procedures as outlined in this manual
The operator must have adequate training for this type of platform.

The machine is fitted with a safety harness point as standard.  If the operator chooses to 
wear a safety harness, an approved ‘fall restraint’ type harness should be worn.

Operating procedures are divided into three key areas:

 1.  

Pre-operation checks. 

 

  What to do before operating the machine.

 2.  

Normal operation. 

 

  How to use the machine safely.

 3.  

Emergency operation. 

 

  How to lower the machine without power or in the event of 

  

operator 

incapacity.

There is no specific legal requirement to wear a safety harness. However,
there is an employers’ requirement to ensure the correct equipment is
used for a task and that it is used correctly and safely. For this requirement
to be met, a risk assessment should be conducted to assess the potential
risks and if an increase in operator safety can be achieved with a safety 
harness, then use a ‘fall restraint’ type harness only.

6

Содержание 830p

Страница 1: ...www powertowers com Operating and Maintenance Manual...

Страница 2: ...he risks associated with portable scaffold towers It is suitable for any application provided it is used within its specified operating parameters If used for applications such as sand blasting weldin...

Страница 3: ...e 0 mph Manual push force on level ground 9 kg Maximum total weight Inc payload 485 kg Maximum castor point load 180 kg 1 77 kN Max wheel force 180 kg 1 77 kN Closed Dimensions Length 1 195 m Width 0...

Страница 4: ...e 200N 5 Never use in the vicinity of live conductors 6 Never try to move the machine on its castors when elevated 7 Never extend the height of the platform by using boxes steps ladders etc 8 Never mo...

Страница 5: ...PRIMARY COMPONENTS PRIMARY COMPONENT LOCATIONS 5 Control Box Entrance Gate Latch Spirit Level Swivel Castor Auto Lok Braked Wheel Emergency Stop Battery Isolator Emergency Lowering Valve...

Страница 6: ...ooses to wear a safety harness an approved fall restraint type harness should be worn Operating procedures are divided into three key areas 1 Pre operation checks What to do before operating the machi...

Страница 7: ...y Position machine under application Refer to working envelope diagram if necessary 1 Apply both castor brakes Pic 1 2 Check spirit level to ensure machine is level Pic 2 3 Ensure the emergency loweri...

Страница 8: ...ntrol failure or operator incapacity and for no other purpose To lower the platform 1 Locate emergency lowering valve at base of machine see Pic right 2 Push twist 90 degrees anti clockwise and releas...

Страница 9: ...pendant controller will indicate charge level The charge is complete when the 2 Green LEDs are illuminated if the LED indicator is fitted to the pendant controller Pic D or the pointer is fully over t...

Страница 10: ...ttery charge indicator on the pendant controller will indicate charge level The charge is complete when the 2 Green LEDs are illuminated if the LED indicator is fitted to the pendant controller Pic D...

Страница 11: ...ect and reconnect to the mains supply If flashing continues seek technical support The LEDs will illuminate in sequence and when the full LED is illuminated the charge is complete Additionally the bat...

Страница 12: ...t overfilled The level must only be checked when the machine is in the transport position The correct level in this condition is approximately 3 4 from the base of the tank as indicated by the line 3...

Страница 13: ...Check rear wheels to ensure retention circlip is securely fitted to end of stub axle and plastic cap is fitted over it MOTOR CONTACTOR SOLENOIDS When conducting the six monthly LOLER inspection check...

Страница 14: ...long with a spacer washer that enables a higher bolting torque to be applied This will improve the reliability of the fix but will not increase the strength of the castor assembly The new fixing nut a...

Страница 15: ...of the castor bracket The castor is highly rated for the application so if visible distortion is evident a significant impact will have occurred and under these conditions the castor and fixing must...

Страница 16: ...bottom of the middle section contacts the lower rest buffers and the outer section continues to close over the middle section It is essential the mast closes in this sequence To ensure the mast secti...

Страница 17: ...ructure and chassis Swivel castor condition and security Axle and wheels for condition and security Condition and operation of spirit level Condition of component and battery covers Condition of all l...

Страница 18: ...riodically not required if AGM battery is fitted If this is not practical then the charger should be switched on once a week for half an hour This is especially important in cold conditions The hydrau...

Страница 19: ...ognised agents for repair or assessment against a warranty claim on the machine or component Materials and or labour costs to renew repair or replace components due to fair wear and tear Faults arisin...

Страница 20: ...Charger 110V IP20 PT E 001 Battery Charger 110V IP65 PT E 001 2 Battery charger 230V IP65 PT E 001E E 12V 105A Lead Acid Battery PT E 002 AGM Battery PT E 002AGM F 110V Plug PT E 010 HYDRAULIC PARTS P...

Страница 21: ...w Gate PTN M 350 F Rubber Buffer PT M 126 G Cover Securing Knob PT M 107 H Tool Tray PTN M 303 I Buffer Wheel PTN M 302 J Decal Set 1 PTN M 322 Decal Set 2 Nano PTN M 310 Decal Set 2 830P PTN M 310 2...

Страница 22: ...PIN CONNECTOR PLUG OPTIONAL SOLENOID DETECTION DEVICE N O N O DOWN UP N O OPTIONAL GROUND CONTROLS OPTIONAL DEAD MAN S PLATFORM CONTROLS OPTIONAL DEAD MAN S OPTIONAL GROUND CONTROLS SUZIE CABLE POWER...

Страница 23: ...CIRCUIT DIAGRAM HYDRAULIC 23 Relief Valve preset to 65 Bar 12V DC Powerpack Single Action 2 stage lift cylinder Manual Bypass Solenoid Lock Valve Steel Pipe Orifice 3 1cc rev...

Страница 24: ...N OP UK 12 17 www powertowers com 100 British designed and manufactured...