background image

MAINTENANCE PROCEDURES

13

HYDRAULIC OIL 

The hydraulic oil must be replaced on an annual basis.  If the oil is not 
replaced, then premature wear and failure of components will occur.
To drain the hydraulic tank, the mast must be in the transport position, 
and the platform tilted to allow access to the motor/pump unit. The 
only practical method to remove the oil from the tank is to use a syringe 
suitable for hydraulic oil, which are easily obtainable, or a vacuum system 
for hydraulic oil. The hydraulic steel pipe connection to the cylinder must 
not be disconnected, unless by a competent person. If the connection 
has been disconnected, then a full pressure test of the system must be 
conducted prior to placing the machine back into service. No leaks must 
be evident when the pressure test is conducted.

Refill with grade 32 mineral oil.

WHEELS AND CASTORS

It is absolutely essential that the wheels and castors are maintained in 
good condition at all times, for two reasons:

The first is that they act as the stabilisers, and whilst their load capacity 
is over rated for the application, any failure could result in a serious 
accident.  Secondly, if the bearings become tight, then it will make the 
machine difficult to manoeuvre.

A measure of horizontal push force can simply be made to determine the 
condition of the wheel bearings.  On a flat smooth surface the machine 
should move with a force of 9 – 10 kg at the mid guard rail height.  The 
maximum allowance is 20 kg.

Obviously this force is dependant upon the surface and gradient, but the 
above is the recognised method of measurement, in accordance with HSE 
guidelines.

Check rear wheels to ensure retention circlip is securely fitted to end of 
stub axle and plastic cap is fitted over it.

MOTOR CONTACTOR SOLENOIDS

When conducting the six monthly LOLER inspection, check the correct 
functioning of the two motor contactors.

Fit new contactors after every three years.

SUZI CABLE CONNECTOR PLUG MAINTENANCE

In order to ensure the reliable and correct operation of the machine it is 
highly recommended that on a six monthly basis the connector plug be 
separated and the condition of the connector plugs pins be noted and an 
anti-corrosive spray be applied before reassembly.

Locate the plug on the end of the wire from the suzi cable and holding 
both the wires and the rubber body of the connector plug, pull the two 
halves apart. The plugs cans sometimes be difficult to separate and it may 
be found that rolling back the outer boot prior to pulling the plug apart 
can help.

Once separated look at the condition of the pins. If found to be corrosion 
free then spray the pins and sockets with Ambersil S4. Hold each half of 
the connector plug vertically and spray a liberal amount of the anti-
corrosive grease into the plug and pins and allow to drain into the back 
of the plug body. The spray can also be applied to the rubber boot. Re-
assemble the plug.

 

If the pins are found to have corrosion they must be replaced. In this case 
please refer to Power Towers technical department for assistance.

When replacing components for any reason, only use OEM specification 
parts, either supplied from the manufacturer or authorised in writing 
by the manufacturer. Warranties and design approvals will be void if 
alternative components are fitted.

It is essential to obtain manufacturer’s approval of any alteration 
which might affect stability, strength or performance in writing before 
proceeding.

Содержание 830p

Страница 1: ...www powertowers com Operating and Maintenance Manual...

Страница 2: ...he risks associated with portable scaffold towers It is suitable for any application provided it is used within its specified operating parameters If used for applications such as sand blasting weldin...

Страница 3: ...e 0 mph Manual push force on level ground 9 kg Maximum total weight Inc payload 485 kg Maximum castor point load 180 kg 1 77 kN Max wheel force 180 kg 1 77 kN Closed Dimensions Length 1 195 m Width 0...

Страница 4: ...e 200N 5 Never use in the vicinity of live conductors 6 Never try to move the machine on its castors when elevated 7 Never extend the height of the platform by using boxes steps ladders etc 8 Never mo...

Страница 5: ...PRIMARY COMPONENTS PRIMARY COMPONENT LOCATIONS 5 Control Box Entrance Gate Latch Spirit Level Swivel Castor Auto Lok Braked Wheel Emergency Stop Battery Isolator Emergency Lowering Valve...

Страница 6: ...ooses to wear a safety harness an approved fall restraint type harness should be worn Operating procedures are divided into three key areas 1 Pre operation checks What to do before operating the machi...

Страница 7: ...y Position machine under application Refer to working envelope diagram if necessary 1 Apply both castor brakes Pic 1 2 Check spirit level to ensure machine is level Pic 2 3 Ensure the emergency loweri...

Страница 8: ...ntrol failure or operator incapacity and for no other purpose To lower the platform 1 Locate emergency lowering valve at base of machine see Pic right 2 Push twist 90 degrees anti clockwise and releas...

Страница 9: ...pendant controller will indicate charge level The charge is complete when the 2 Green LEDs are illuminated if the LED indicator is fitted to the pendant controller Pic D or the pointer is fully over t...

Страница 10: ...ttery charge indicator on the pendant controller will indicate charge level The charge is complete when the 2 Green LEDs are illuminated if the LED indicator is fitted to the pendant controller Pic D...

Страница 11: ...ect and reconnect to the mains supply If flashing continues seek technical support The LEDs will illuminate in sequence and when the full LED is illuminated the charge is complete Additionally the bat...

Страница 12: ...t overfilled The level must only be checked when the machine is in the transport position The correct level in this condition is approximately 3 4 from the base of the tank as indicated by the line 3...

Страница 13: ...Check rear wheels to ensure retention circlip is securely fitted to end of stub axle and plastic cap is fitted over it MOTOR CONTACTOR SOLENOIDS When conducting the six monthly LOLER inspection check...

Страница 14: ...long with a spacer washer that enables a higher bolting torque to be applied This will improve the reliability of the fix but will not increase the strength of the castor assembly The new fixing nut a...

Страница 15: ...of the castor bracket The castor is highly rated for the application so if visible distortion is evident a significant impact will have occurred and under these conditions the castor and fixing must...

Страница 16: ...bottom of the middle section contacts the lower rest buffers and the outer section continues to close over the middle section It is essential the mast closes in this sequence To ensure the mast secti...

Страница 17: ...ructure and chassis Swivel castor condition and security Axle and wheels for condition and security Condition and operation of spirit level Condition of component and battery covers Condition of all l...

Страница 18: ...riodically not required if AGM battery is fitted If this is not practical then the charger should be switched on once a week for half an hour This is especially important in cold conditions The hydrau...

Страница 19: ...ognised agents for repair or assessment against a warranty claim on the machine or component Materials and or labour costs to renew repair or replace components due to fair wear and tear Faults arisin...

Страница 20: ...Charger 110V IP20 PT E 001 Battery Charger 110V IP65 PT E 001 2 Battery charger 230V IP65 PT E 001E E 12V 105A Lead Acid Battery PT E 002 AGM Battery PT E 002AGM F 110V Plug PT E 010 HYDRAULIC PARTS P...

Страница 21: ...w Gate PTN M 350 F Rubber Buffer PT M 126 G Cover Securing Knob PT M 107 H Tool Tray PTN M 303 I Buffer Wheel PTN M 302 J Decal Set 1 PTN M 322 Decal Set 2 Nano PTN M 310 Decal Set 2 830P PTN M 310 2...

Страница 22: ...PIN CONNECTOR PLUG OPTIONAL SOLENOID DETECTION DEVICE N O N O DOWN UP N O OPTIONAL GROUND CONTROLS OPTIONAL DEAD MAN S PLATFORM CONTROLS OPTIONAL DEAD MAN S OPTIONAL GROUND CONTROLS SUZIE CABLE POWER...

Страница 23: ...CIRCUIT DIAGRAM HYDRAULIC 23 Relief Valve preset to 65 Bar 12V DC Powerpack Single Action 2 stage lift cylinder Manual Bypass Solenoid Lock Valve Steel Pipe Orifice 3 1cc rev...

Страница 24: ...N OP UK 12 17 www powertowers com 100 British designed and manufactured...

Отзывы: