Power Towers 830p Скачать руководство пользователя страница 14

CASTOR SAFETY & MAINTENANCE

14

CASTOR SAFETY & MAINTENANCE

In order to ensure the castors are maintained in serviceable and safe 
condition, regular inspection is required, especially where arduous 
conditions are known to be involved or there is a suspicion of misuse or 
abuse. The other key element to ensure is in safe serviceable condition, is 
the castor fixing bolt, the condition of which can usually be determined 
from the condition of the castor bracket.

The castor is highly rated for the application so if visible distortion is 
evident a significant impact will have occurred and under these conditions 
the castor and fixing must be replaced. 

Typical signs of impact which would require castor and fixing replacement:

It may be thought feasible to repair the castor in a number of these 
instances, but serious structural damage will have occurred to the head 
bearing and castor assembly as well as possibly damage to the main 
fixing bolt. THE CASTOR AND FIXING BOLT MUST BE REPLACED.

When inspecting a castor in order to 
determine its serviceability, pay particular 
attention to the head swivel bearing 
(compare to a new one if possible) and the 
boss/rivet which goes through the centre 
of the swivel bearing and which clamps the 
assembly together. 

If the castor is in sound condition, 
free from distortion then it may be adequate 
to only replace the main fixing 
bolt with one of a higher tensile 
strength, along with a spacer 
washer that enables a higher 
bolting torque to be applied. 
This will improve the reliability of 
the fix, but will not increase the 
strength of the castor assembly. 
The new fixing nut and bolt are to 
be re-torqued to 80Nm.

In order to replace the fixing bolt, the wheel axle 
bolt, half nut and star washer will first need to be 
removed, along with the central bushing tube 
and M12 end washers. This enables the wheel to 
be removed so that the castor fixing bolt can be 
replaced. When refitting the wheel, the axle bolt, 
half nut and star washer, must be replaced with 
OEM specification new parts and re-torqued to 
40Nm (Pic A). Ensure the axle tube and assembly is lightly greased to 
ensure a smooth action when operating the foot brake.

Power Towers Limited strongly recommends replacing any castor 
assembly that is over 3 years old with a new one.

Swivel bearing head 

should feel free to rotate 

and not loose

Castor fixing bolt

Side impact and foot 
pedal distortion as a 
result of a significant side 
impact.

Top mounting plate distortion as a 
result of a single significant impact 
or multiple lower level impacts. 

Even if the rest of the castor is 
in good condition, it must be 
replaced.

Foot pedal distortion as a result 
of a significant frontal impact; it is 
likely the top plate and bearing will 
be distorted as well.

Pic A.

Important.
These instructions apply to all machines BEFORE 
serial no. 26953115C

Castor Fixing Bolt (M12):  

Torque - 80 Nm

Castor Axle Bolt: 

Torque - 40 Nm

M12 nyloc nut 
torque to 80Nm.
M12 standard washer.

Special thin spacer 
washer on top of swivel 
bearing of castor

M12X60 10.9 bolt

Содержание 830p

Страница 1: ...www powertowers com Operating and Maintenance Manual...

Страница 2: ...he risks associated with portable scaffold towers It is suitable for any application provided it is used within its specified operating parameters If used for applications such as sand blasting weldin...

Страница 3: ...e 0 mph Manual push force on level ground 9 kg Maximum total weight Inc payload 485 kg Maximum castor point load 180 kg 1 77 kN Max wheel force 180 kg 1 77 kN Closed Dimensions Length 1 195 m Width 0...

Страница 4: ...e 200N 5 Never use in the vicinity of live conductors 6 Never try to move the machine on its castors when elevated 7 Never extend the height of the platform by using boxes steps ladders etc 8 Never mo...

Страница 5: ...PRIMARY COMPONENTS PRIMARY COMPONENT LOCATIONS 5 Control Box Entrance Gate Latch Spirit Level Swivel Castor Auto Lok Braked Wheel Emergency Stop Battery Isolator Emergency Lowering Valve...

Страница 6: ...ooses to wear a safety harness an approved fall restraint type harness should be worn Operating procedures are divided into three key areas 1 Pre operation checks What to do before operating the machi...

Страница 7: ...y Position machine under application Refer to working envelope diagram if necessary 1 Apply both castor brakes Pic 1 2 Check spirit level to ensure machine is level Pic 2 3 Ensure the emergency loweri...

Страница 8: ...ntrol failure or operator incapacity and for no other purpose To lower the platform 1 Locate emergency lowering valve at base of machine see Pic right 2 Push twist 90 degrees anti clockwise and releas...

Страница 9: ...pendant controller will indicate charge level The charge is complete when the 2 Green LEDs are illuminated if the LED indicator is fitted to the pendant controller Pic D or the pointer is fully over t...

Страница 10: ...ttery charge indicator on the pendant controller will indicate charge level The charge is complete when the 2 Green LEDs are illuminated if the LED indicator is fitted to the pendant controller Pic D...

Страница 11: ...ect and reconnect to the mains supply If flashing continues seek technical support The LEDs will illuminate in sequence and when the full LED is illuminated the charge is complete Additionally the bat...

Страница 12: ...t overfilled The level must only be checked when the machine is in the transport position The correct level in this condition is approximately 3 4 from the base of the tank as indicated by the line 3...

Страница 13: ...Check rear wheels to ensure retention circlip is securely fitted to end of stub axle and plastic cap is fitted over it MOTOR CONTACTOR SOLENOIDS When conducting the six monthly LOLER inspection check...

Страница 14: ...long with a spacer washer that enables a higher bolting torque to be applied This will improve the reliability of the fix but will not increase the strength of the castor assembly The new fixing nut a...

Страница 15: ...of the castor bracket The castor is highly rated for the application so if visible distortion is evident a significant impact will have occurred and under these conditions the castor and fixing must...

Страница 16: ...bottom of the middle section contacts the lower rest buffers and the outer section continues to close over the middle section It is essential the mast closes in this sequence To ensure the mast secti...

Страница 17: ...ructure and chassis Swivel castor condition and security Axle and wheels for condition and security Condition and operation of spirit level Condition of component and battery covers Condition of all l...

Страница 18: ...riodically not required if AGM battery is fitted If this is not practical then the charger should be switched on once a week for half an hour This is especially important in cold conditions The hydrau...

Страница 19: ...ognised agents for repair or assessment against a warranty claim on the machine or component Materials and or labour costs to renew repair or replace components due to fair wear and tear Faults arisin...

Страница 20: ...Charger 110V IP20 PT E 001 Battery Charger 110V IP65 PT E 001 2 Battery charger 230V IP65 PT E 001E E 12V 105A Lead Acid Battery PT E 002 AGM Battery PT E 002AGM F 110V Plug PT E 010 HYDRAULIC PARTS P...

Страница 21: ...w Gate PTN M 350 F Rubber Buffer PT M 126 G Cover Securing Knob PT M 107 H Tool Tray PTN M 303 I Buffer Wheel PTN M 302 J Decal Set 1 PTN M 322 Decal Set 2 Nano PTN M 310 Decal Set 2 830P PTN M 310 2...

Страница 22: ...PIN CONNECTOR PLUG OPTIONAL SOLENOID DETECTION DEVICE N O N O DOWN UP N O OPTIONAL GROUND CONTROLS OPTIONAL DEAD MAN S PLATFORM CONTROLS OPTIONAL DEAD MAN S OPTIONAL GROUND CONTROLS SUZIE CABLE POWER...

Страница 23: ...CIRCUIT DIAGRAM HYDRAULIC 23 Relief Valve preset to 65 Bar 12V DC Powerpack Single Action 2 stage lift cylinder Manual Bypass Solenoid Lock Valve Steel Pipe Orifice 3 1cc rev...

Страница 24: ...N OP UK 12 17 www powertowers com 100 British designed and manufactured...

Отзывы: