OPERATING THE ENGINE
ENGINE STARTING CONTROLS
1)
Generator Main Switch must be in the ON position.
2)
Hold Start/Stop Switch for 1 second and release.
3)
Glow Plugs will preheat for 8 seconds. LED flashes slowly.
4)
Preheating will cease during engine cranking cycle. LED continues flashing.
5)
Engine begins an 8 seconds crank cycle, After 4 seconds of cranking the PT-ECU-63 will check
for an AC signal from the generator. If an AC signal is verified the engine will start and the LED
will remain ON during the normal run operation. If the AC signal is not verified the PT-ECU-63
will terminate the cranking cycle and LED will flash a fault code.
6)
Starter disengages immediately after engine run is verified.
7)
PT-ECU-63 deactivates the Low Oil Pressure and High Water Temperature Switches for 6
seconds, this will assure oil pressure build-up time. If oil pressure does not build-up the engine will
immediately shut down and go into a fault mode. Likewise for a high temperature situation.
8)
If engine will not start on the first attempt the PT-ECU-63 will initiate the start cycle 2 more times
before going into a fault mode. Glow Plugs will preheat for 8 seconds per attempt. Engine will
crank for 8 seconds per attempt.
9)
To shut down the engine under normal operations, hold the Start/Stop Switch for 1 second and
release.
10)
If a fault occurs turn Generator Main Switch OFF and then ON to reset PT-ECU-63.
CHECKING ENGINE AFTER STARTING
1)
Allow the engine to warm up 3 to 5 minutes before applying a load. In colder climates allow a few
extra minutes longer.
2)
Perform a visual inspection of all areas of the engine and generator.
3)
Listen for any abnormal noises.
4)
Check for any abnormal exhaust gases.
STOPPING THE ENGINE
It is recommended to disconnect or reduce the power load from the generator before shutting down the
engine. Then follow the steps outlined above for normal shut down.
NOTE:
The PT-ECU-63 is designed to operate on 12V DC power. In a low battery situation the
PT-ECU-63 may not initiate the normal cranking cycle. To start the generator you can press and
hold the Start/Stop Switch for approximately 10 seconds or until the engine starts. Once the
engine starts the PT-ECU-63 will resume normal operations. If this situation re-occurs, charge or
replace the battery.
IMPORTANT:
Damage to the Starter Motor, Starter Solenoid, Run Solenoid or any generator component
due to excessive or prolonged starting attempts attributed to an external Low Battery Control Monitoring
or Auto-Start System will not be covered by the Power Technology Southeast, Inc. Limited Warranty.
2
Содержание PTS-15
Страница 30: ...120 VOLT CONNECTION M SERIES EXCITER TYPE 9...
Страница 31: ...120 240 VOLT CONNECTION M SERIES EXCITER TYPE 10...
Страница 43: ......
Страница 44: ...9...
Страница 47: ...12...
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 63: ...Power Controller Module PCM And Display PCMD...
Страница 74: ...KUBOTA 12Volt DC POWER CONTROL MODULE WIRING SCHEMATIC 11...