
-14-
AC input of 3KVA adopts line bank, and the AC output adopts socket.
You can insert load power cord into
the output socket directly.
Normally, the load current of each socket cannot exceed 10A.
When connecting the line bank, take the small cover board off from the line
bank, and pay attention to the definition of connection terminal: from the right to
the left (rear view) orderly to AC input are: live wire (L), neutral wire (N) and
ground wire (PE). After the connection, please check up whether the wire of
connection is correct and firm, and then install the small cover board back to
the box.
For long time-delay UPS, battery input expansion line is required to be
connected. That is, insert the battery connection wire two-core plug of the
battery box into the two-core socket on main unit rear panel. Refer to the
relevant content of the battery box installation and cable connection.