Diagram 12: PRO 60KVA Dual front view
with door open
Diagram 13: PRO 80KVA Dual front view
with door open
1. RS-232 communication port)
2. USB communication port
3. Emergency power off function connector (EPO connector)
4. Share current port (only available for parallel model)
5. Parallel port (only available for parallel model)
6. Intelligent slot
7. External battery connector/terminal
8. Line input circuit breaker/switch
9. Maintenance bypass switch (option)
8
Содержание PRO 3.3 10KVA
Страница 1: ......
Страница 2: ......
Страница 8: ......
Страница 20: ...Terminal block wiring diagram for PRO 30KVA 40KVA Dual Terminal block wiring diagram for PRO 60KVA 80KVA 12 ...
Страница 64: ......