Installation and Operating Instructions PBX-200 PB / Li
page 24
3.
Power-Blox set up
4.
Mount the solar module using a suitable mount at the destination
5.
Lay the solar cable to the Power-Blox and connect it to the solar socket (8) or the
clamping block (19)
6.
If necessary, transfer the transfer connector (16) to the building distributor
7.8.2
Installation of additional Power-Blox to a tower or a Power-Wall (maximum 9 units)
1.
According to the previous chapter, install the first Power-Blox
2.
Put Second Power-Blox on top and make a tower. The sockets must point in the same
direction
3.
Put the third Power-Blox on top of the tower and in turn check the socket orientation
4.
Cable the tower according to the instructions in chapter 7.2.5
5.
Next Power-Blox next to the existing tower place and in turn minimum distances
according to chapter 7.2.6
6.
Transfer cable (9) from the first tower to the last Power-Blox and connect it to transfer
socket (6). See also wiring diagram in chapter 7.2.7
7.
Now continue with next Power-Blox as described in step 2, until the maximum number of
nine Power-Blox of the Power-Wall is reached
8.
If necessary, transfer the transfer connector (16) to the building distributor
7.8.3
Installation of power systems greater than 9 Power-Blox
1.
Install several power-walls according to the previous chapter
2.
Within the building distributor, the individual power-walls can be routed through a 10 A
(Type B) line circuit breaker and the phases of the individual power-walls can be
combined again behind the line protection switches