Important
Failure to install the condensate discharge pipework correctly will
affect the reliable operation of the boiler.
Careful consideration must be given to the possibility of the pipe
work being subject to freezing conditions and appropriate meas
ures taken to prevent blockage. Correct installation in accordance
with this section will considerably minimise the likelihood of block
age and subsequent boiler lock-out.
A condensate discharge pump and pipe "Trace Heating" are avail
able as accessories.
The condensate discharge pipe MUST NOT RISE at any point
along its length. There MUST be a fall of AT LEAST 2.5° (50mm
per metre) along the entire run EXCEPT when employing a suita
ble condensate pump in basement and cellar or similar applica
tions.
The boiler condensate trap incorporates a seal of 75mm, therefore
it is unnecessary to install an air break and trap in the discharge
pipework.
The condensate outlet will accept 21.5mm (
3
/
4
in) plastic overflow pipe. It is
strongly recommended that this discharges internally into the household
drainage system. Where this is not possible, discharge into an outside
drain is permissible providing every possible precaution is taken to prevent
freezing.
Ensure the discharge of condensate complies with any national or local
regulations in force. BS 6798 & Part H1 of the Building Regulations give
further detailed guidance.
The discharge pipe should be run in a proprietary drain pipe material e.g.
PVC, PVC-U, ABS, PVC-C or PP.
Metal pipework is NOT suitable for use in condensate discharge systems.
The pipe should be a minimum of 21.5mm diameter and must be suppor
ted using suitably spaced clips of the correct design to prevent sagging.
It is advisable that the full length of condensate pipe is run internally and
preferably be less than 3 metres.
Internal runs greater than 3 metres or runs in cold areas should use 32mm
waste pipe.
External runs MUST be a MINIMUM of 32mm and fully insulated with ma
terial suitable for external use.
If the boiler is fitted in an unheated location the entire condensate dis
charge pipe should be treated as an external run and sized and insulated
accordingly.
In all cases discharge pipe must be installed to aid disposal of the conden
sate. To reduce the risk of condensate being trapped, as few bends and
fittings as possible should be used and any burrs on cut pipe removed.
When discharging condensate into a soil stack or waste pipe the effects of
existing plumbing must be considered. If soil pipes or waste pipes are sub
jected to internal pressure fluctuations when WC's are flushed or sinks
emptied then backpressure may force water out of the boiler trap and
cause appliance lockout.
A boiler discharge pump is available which will dispose of both condensate
& high temperature water from the relief valve. It has a maximum head of
5 metres. Follow the instructions supplied with the pump.
Condensate Drain Pipe "Trace Heating" Elements are available in various
lengths, 1, 2, 3 & 5 metres. Where the drain is between 3 & 5 metres a 5
metre kit can be used and "doubled back" upon itself.
It is possible to fit the element externally on the condensate drain or inter
nally as detailed in the instructions provided.
The fitting of a "Trace Heating" Element is NOT a substitute for correct in
stallation of the condensate drain. ALL requirements in this section must
still be adhered to.
Fig.14
Methods of termination continued
PN-0000455
E
3
5
F
G
3
3
5
5
7
7
10
11
11
10
12
6
5 Before installation
7678846 - A - 22052017
31
Содержание assure combi 25
Страница 74: ...14 Appendix 74 7678846 A 22052017 ...