Part 9
CABLE PASSAGE
Please route all cables through the cable passage to main unit in
desktop mount application. Hold them together with the cable tie. Pass all
cables (but those for HDD and UPS battery) through the cable exit to external
connections. For slim base models in desktop mount application, when cable
connection through a hole on desktop underneath the system is required, please
slide open the auxiliary cable exit on bottom plate and route all external
connections through this auxiliary exit. Then fix back the bottom plate if there
is no option unit to install.
INSTALLING UPS BATTERY
The optional UPS battery is delivered in the carton if it is ordered. For
slim base model, please place the UPS battery in the
direction shown in the right picture and use the Velcro
strap through the 2 standing slits on base box to fix the
battery in position firmly. Route the battery connection
cable through appropriate
passage to the battery
connector on the main unit.
Please remove the UPS battery bracket fixing
screw and slide right the UPS battery bracket to take it
out for universal base model as in left picture. Put the
battery in at the other end first and remount the
bracket with its tongue matching under a bridge in the
wall of base box from the right as arrowed in above
1
10
5
6
12
8
11
3
4
9
7
2
10
Inside universal base
1. Cable Exit For External Connections
2. Base Box Screw
13. UPS Battery
3. Cable tie
5. Cable Passage To Main Unit For
Desktop Mount Application
6. Cable Passage To Main Unit For
Wall Mount Application
9. HDD Unit
7. HDD Bracket Fixing Screw
10. Power Adaptor Bracket Fixing Screws
8. Power Adaptor In Universal Base
4. CD-ROM Bracket For Universal Base
11. UPS Battery Bracket
12. UPS Battery Bracket Fixing Screw
14. Velcro Strap