15.
Stretch the net and check the operation of the mosquito
net. If necessary, adjust the position of the latch clips for
the mosquito net in the guides by loosening the clips with
a 2 mm Allen key and set them at the appropriate height
.
14.
Lower the net and, holding the bottom lath diagonally,
place the net together with the lath in the guides below
the sliders
.
12.
To install the package, unscrew the screws fastening
the inspection cover
.
5
INSTALLATION OF ZF3000
-BX
EXTERNAL BLINDS
10.
Drill holes for mounting pins in the rear part of the box
.
11.
Screw the box to the wall with appropriate mounting pins
.
11a.
Drill holes for mounting pins through the brackets, then
screw them to the wall
.
BOX ANCHORING 250 INSTALLATION ON THE FACADE
BOX ANCHORING, FLUSH-MOUNTED INSTALLATION
10a.
Apply the mounting brackets (1) to the previously
prepared holes in the box and screw them with the M6x12
screw (included in the set). Option for an extra charge
.
1
1
13.
Set the top rail handles so that they do not collide with
the bearing or the motor
.