
26
27
EN
RECTANGULAR DESIGN
ASSEMBLY
Step 10 (option)
Step 7
Step 8
Plug the ionizer and screw it to his place.
After moving the cables outside the cabin, carefully posi-
tion the ceiling over the cabin so as not to damage the
temperature sensor.
Press ION to prevent
diseases of ventilation.
Press O3 for disinfection
with ozone.
The remaining cables must be
connected in accordance with the
number of pins on each connector.
Once the connections are complete,
position the protective plywood
sheet on the ceiling.*
Pass the cables into the ceiling via
the openings provided.
Step 9
Connect the cables to the control box in accordance with
their coding (Cable A. Load A, Cable B. Load B, etc.).
* After checking that the sauna is working correctly, we recommend that you screw the ceiling’s plywood sheet tight to the upper
panel. As the sauna can reach very high temperatures, this part can often exhibit variations in shape, especially at the corners.
Important: The screws must be removed if you need to carry out maintenance.
Insert the screws through the inside
of the door and fix the handle. The
metal part must be on the outside of
the cabin. (depending on model)
On the outside of the door, position the handle in line with
the holes provided.