PONNDORF Gerätetechnik GmbH
Leipziger Strasse 374
D - 34123 Kassel
Operation Manual
Hose Pump Series
P_delta / PD-S
Page 24 of 29
Version 003_GB / 04.2021
7.4
Adjustment of gap
Construction of lifting unit
Eccentric bolt
Release the clamp and adjust the eccentric as follows:
Normal position
Maximum gap
Minimum gap
P_delta 15
approx. 11 mm
approx. 12 mm
approx. 10 mm
P_delta 19
approx. 8 mm
approx. 9 mm
approx. 7 mm
↕
Check correct position of the stud screw pos. 3.
Angle of pos. 1 to pos. 2 must be 90°.
Check gap between roller and hose bed.
Finally tighten the eccentric clamp (20 Nm).
Should min. gap size setting results in a
dimension > 10/7 mm
→ check rollers and
bearings!
Clamping of eccentric
AF 13 to hold up
Gap
Note position of the
stud screw to the hole
on the shaft!
1
2
3
Содержание P delta 15
Страница 1: ...Hose Pump Series P_delta PD S Operation Manual...
Страница 2: ......