ēno flex Installation Guide 

16 

Installation and Operation Guide 

Lock the tray together 

To lock the tray together: 

1.  Fasten the three tray sections together using six pan head #6 x 1/4" (6.4 mm) screws (provided 

in the hardware kit) into the tray from the bottom. The tray is pre-drilled for each screw location, 
as shown below. 

 

Step 10: Install the map rail tack material, map clips, and flag holder 

1.   Locate the roll of forbo tack materal, two map clips, and flag holder from the main box 

compartment. 

2.  Remove the left or right map rail endcap by unscrewing the Phillips screw from the side face. 

 

 

 

3.  Gently feed the forbo tack material into the channel. 

4.  Cut away the excess tack materail so that it is flush with the side trim.  

 NOTE

: Ensure that the trim is fully installed and behind the endcaps before cutting to ensure 

rough edges are hidden. 

Содержание ?no flex

Страница 1: ...no flex Installation Guide Part number 2002083 001 Rev A 2011 PolyVision Corporation All rights reserved...

Страница 2: ...the chalk tray 8 Step 3 Pre drill clearance holes in the center chalk tray 9 Step 4 Fasten the center chalk tray to the wall 10 Step 5 Add the left and right chalk tray sections 11 Step 6 Fasten L cl...

Страница 3: ...DAMAGE OR PERSONAL INJURY Read the entire Assembly Direction before beginning installation or assembly Building construction varies greatly and is outside PolyVision s control The Building s Engineer...

Страница 4: ...eboard assembly 2 Left panel assembly Marker or Tack 3 Right panel assembly Marker or Tack 4 Left and right chalk tray sections 5 Center chalk tray sections 6 Map rail tack material roll 7 Map clips x...

Страница 5: ...nstallation Guide PolyVision 5 Required items Level 2 Phillips screw driver Pencil Stud finder for sheetrock walls Measuring tape Power Drill and or Hammer drill Ladder Appropriate fasteners for wall...

Страница 6: ...lation If mounting to a wood stud wall lag screw with 7 16 hex head 11mm 2 5 64mm long for mounting to wood stud 20 Toggle bolts 2 5 64mm long for mounting to sheetrock If mounting to a metal stud wal...

Страница 7: ...m assemble requires at least 198 5 03m in width The 12 foot 3 66 m assemble requires at least 150 inches 3 81m in width Both products require at least 84 2 13m from floor to ceiling for proper instal...

Страница 8: ...e 38 968 mm off the floor for adults or 32 for children The line should be 144 inches 3 658 m or 192 inches 4 877 m wide off the center mark depending on the model being installed 32 813mm 38 965mm NO...

Страница 9: ...center of the tray as shown below 2 Mark the top edge of the tray every 18 457 mm Center the first mark and add the remaining marks 18 out in each direction for no Flex A 2xx Add the marks at 11 for...

Страница 10: ...marked level line and the center notch feature aligned with the center mark on the wall 2 Fasten the center tray section to the wall every 18 Sheetrock walls Capture the wall stud where possible using...

Страница 11: ...he center tray section to mark and drill clearance holes in the chalk tray every 18 457mm as applicable to your installation Center the first bolt with the remaining bolts 18 out in each direction usi...

Страница 12: ...ons as follows For 12 3 66 m no flex products 1 5 0 46 m 4 1 22 m and 5 1 52 m from the center in both directions Where possible capture wall studs on sheetrock walls For 16 4 88 m no flex products 2...

Страница 13: ...red All panels should sit flat in the tray To install the center panel 1 Remove and unwrap all panel assemblies from the main box compartment 2 Locate the center no interactive whiteboard panel This p...

Страница 14: ...1 2 2 Fasten the L clip into the top trim to lock the panel section into place using self tapping 8 x 1 2 screws provided in the hardware kit Step 9 Install left and right panels Caution This is a cr...

Страница 15: ...ped gently to help the dowel pin engagement 4 Tap the two L clips on the wall down so they are flush with the top map rail trim of the left panel Ensure that the panel is flush with the wall 5 Fasten...

Страница 16: ...low Step 10 Install the map rail tack material map clips and flag holder 1 Locate the roll of forbo tack materal two map clips and flag holder from the main box compartment 2 Remove the left or right...

Страница 17: ...install the map rail end cap and fasten it in place with the screw The cap may need to be pressed inward to compress the tack material before installing the screw Install the PolyVision driver Refer t...

Страница 18: ...ter tray section 9 End cap installation 15 Left right chalk tray installation 11 Left right panel installation 14 Lock tray sections 16 Map rail tack installation 16 Position the chalk tray 8 Sheet ro...

Отзывы: