![PolyVision ?no flex Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/polyvision/no-flex/no-flex_installation-manual-and-user-manual_1578284012.webp)
ēno flex Installation Guide
12
Installation and Operation Guide
To install “L” clips:
1. Using a tape measure and level, mark a level line 45” (1.14 m) above the top of the chalk tray all
along the length of the tray.
2
Along that chalk line, mark “L” clip locations as follows:
For 12’ (3.66 m) ēno flex products
–1.5’ (0.46 m), 4’ (1.22 m) and 5’ (1.52 m) from the
center in both directions. Where possible, capture wall studs on sheetrock walls.
For 16’ (4.88 m) ēno flex products
–2’ (0.6 m), 5’ (1.5 m) and 7’ (2.1 m) from center in both
directions. Where possible, capture wall studs on sheetrock walls.
3. Fasten the “L” clip to the wall in the marked locations using hardware appropriate to your wall
material. Hardware should only be finger tight.