3-23
3 First Steps
Vibration
sensor
13. If required screw the isolation stud of the optional A-VIB-ACC1 vibration
sensor into the
10-32 UNF-2B
thread on the back of the scanning head.
14. Screw the vibration sensor on the isolation stud.
15. Connect up the vibration sensor to a
REF
BNC jack on the front of the
front-end.
Figure 3.19: Cabling of the scanning head
OPT
I
ON
L
ASER
S
I
GNA
L
PS
V-500
S
C
ANN
I
NG
H
EAD
Polytec
10-32
U
N
F-2B
EXTERNAL SCANNER
CONTROL (OPTIONAL)
REF
Содержание PSV-500-3D
Страница 19: ...2 4 2 Introduction ...
Страница 55: ...4 10 4 Measuring ...
Страница 63: ...6 6 6 Troubleshooting ...
Страница 97: ...A 12 A Optional Accessories ...
Страница 101: ...C 2 C Declaration of Conformity ...