background image

EZ5018 - SUPERIOR 10 x 18 w/ CLEAR ROOF, CLEAR ENDS, ONE DOOR

BILL OF MATERIALS EZ5018

5

REV: AE-201007

BILL OF MATERIALS

DESCRIPTION

ITEM CODE

QTY

ID

END PKG, DOOR, EZ

EZ2011

1

1

END PKG, NO DOOR, EZ

EZ2012

1

2

INTERIOR FRAME PKG, EZ

EZ2013

2

3

FRAME CONNECTOR PKG, EZ

EZ2014

3

4

COVER PKG, EZ

EZ2015

1

5

5

2

2

4

3

4

3

4

1

4

Содержание Superior EZ5006

Страница 1: ...EZ2011 Page 9 DOOR FRAME ASSEMBLY EZ2011 Page 10 INTERIOR FRAME ASSEMBLY EZ2013 Page 11 END FRAME ASSEMBLY EZ2012 Page 12 END FRAME ASSEMBLY EZ2012 Page 13 CONNECTING THE FRAMES Page 14 CONNECTING THE...

Страница 2: ...et purlins shelving or any objects of significant weight shall not be hung attached or secured to roof or truss members in a manner that will overload the structure Do not walk on polycarbonate sheets...

Страница 3: ...OF CLEAR ENDS ONE DOOR BILL OF MATERIALS EZ5006 3 REV AE 201007 BILL OF MATERIALS DESCRIPTION ITEM CODE QTY ID END PKG DOOR EZ EZ2011 1 1 END PKG NO DOOR EZ EZ2012 1 2 FRAME CONNECTOR PKG EZ EZ2014 1...

Страница 4: ...OOR BILL OF MATERIALS EZ5012 4 REV AE 201007 BILL OF MATERIALS DESCRIPTION ITEM CODE QTY ID END PKG DOOR EZ EZ2011 1 1 END PKG NO DOOR EZ EZ2012 1 2 INTERIOR FRAME PKG EZ EZ2013 1 3 FRAME CONNECTOR PK...

Страница 5: ...BILL OF MATERIALS EZ5018 5 REV AE 201007 BILL OF MATERIALS DESCRIPTION ITEM CODE QTY ID END PKG DOOR EZ EZ2011 1 1 END PKG NO DOOR EZ EZ2012 1 2 INTERIOR FRAME PKG EZ EZ2013 2 3 FRAME CONNECTOR PKG E...

Страница 6: ...BILL OF MATERIALS EZ5024 6 REV AE 201007 BILL OF MATERIALS DESCRIPTION ITEM CODE QTY ID END PKG DOOR EZ EZ2011 1 1 END PKG NO DOOR EZ EZ2012 1 2 INTERIOR FRAME PKG EZ EZ2013 3 3 FRAME CONNECTOR PKG EZ...

Страница 7: ...rview on one of the pages 3 6 4 Open the packaging and sort components by the bill of materials for each of the packages EZ2011 EZ2015 Refer to the bills of materials on pages 3 6 as some models do no...

Страница 8: ...AE 201007 PEAK SUBASSEMBLY 1 Assemble Frames on a flat surface in the following order 2 Assemble the RH Peak Support EZ1128 End Peak EZ1124 and LH Peak Support EZ1126 as shown 3 Parts may need to be...

Страница 9: ...923 7 15 DOOR FRAME ASSEMBLY EZ2011 9 REV AE 201007 6 Attach the Door EZ1138 Door Jamb EZ1131 2 Door End Bench Frames EZ1003 EZ1005 to the PEAK HEADER SUBASSEMBLY The WIGGLE WIRE BASE on the PEAK HEAD...

Страница 10: ...x2 1 2 G5 NB1816 2 9 WING NUT 5 16 ZP NB1903 2 10 WASHER LOCK 5 16 ZP NB1862 2 11 INTERIOR FRAME ASSEMBLY EZ2013 FOR ALL SIZES 10 X 12 AND GREATER 10 REV AE 201007 8 2 7 5 5 1 3 4 3 4 9 11 10 4 3 9 1...

Страница 11: ...8 ZP NB1901 7 12 WING NUT 5 16 ZP NB1903 2 13 WASHER FLAT NYLON NB1923 7 14 B END FRAME ASSEMBLY EZ2012 11 REV AE 201007 13 11 10 12 14 9 14 12 14 12 3 3 13 11 10 6 7 8 4 1 2 12 14 14 12 12 14 9 12 1...

Страница 12: ...ME ASSEMBLY EZ2012 12 REV AE 201007 8 5 14 12 9 14 12 12 14 14 12 2 1 4 7 6 10 11 13 3 3 12 14 12 14 9 14 12 10 11 13 4 Attach the 2 End Frame Tubes EZ1101 2 End Bench Frames EZ1004 EZ1006 to the PEAK...

Страница 13: ...8 WING NUT 1 4 ZP NB1902 4 9 SNAPPER PIN 250 x 2 25 NB1996 2 10 CONNECTING THE FRAMES 13 REV AE 201007 1 Raise the DOOR FRAME SUBASSEMBLY into upright position and open the door to use as a kick stan...

Страница 14: ...4 8 WING NUT 1 4 ZP NB1902 4 9 SNAPPER PIN 250 x 2 25 NB1996 2 10 C CONNECTING THE FRAMES 14 REV AE 201007 1 1 2 6 3 1 1 8 10 7 2 2 6 6 4 5 1 1 7 8 4 5 6 7 8 9 7 8 9 9 9 3 1 1 10 3 Install 2 X Braces...

Страница 15: ...OLT 1 4 x 3 4 G5 NB1820 4 7 WASHER LOCK 1 4 ZP NB1860 4 8 WING NUT 1 4 ZP NB1902 4 9 SNAPPER PIN 250 x 2 25 NB1996 2 10 CONNECTING THE FRAMES 15 REV AE 201007 R 3 9 9 9 8 7 9 8 7 6 5 4 8 7 1 1 5 4 6 6...

Страница 16: ...4 ASSY S A TOP RAIL 74 BROWN SA4018 2 5 3 0 x 55 1 4 8MM CLR PCSS SS1005 4 6 CARRIAGE BOLT 1 4 x 3 4 G5 NB1820 4 7 WASHER LOCK 1 4 ZP NB1860 4 8 WING NUT 1 4 ZP NB1902 4 9 SNAPPER PIN 250 x 2 25 NB199...

Страница 17: ...REV AE 201007 V W 3 9 9 9 8 7 9 8 7 6 5 4 8 7 1 1 5 4 6 6 2 2 7 10 8 1 1 3 6 2 2 Place the End Caps GMSA51 and Dividers GMSA50 from previous assembly step onto the threaded studs for each Frame Subass...

Страница 18: ...9 9 3 4 Remove the protective film from the Clear Polycarbonate Panels SS1005 and be certain to install the Panels with the UV protective blue side to the outside of the structure 5 Set the Panels int...

Страница 19: ...at the base on one corner using an up and down motion to install the wire over the layer of poly into the wiggle wire base Proceed across to the opposite corner skipping over the door if present 3 Lif...

Страница 20: ...e of cover is provided for several lengths of structure there may be a piece left over for other customer uses 2 Drape the Roof Poly Sheet over the roof and position with even surplus at each side Beg...

Страница 21: ...Stake Pads BMS1119 LEVELING THE DOOR HEADER 21 REV AE 201007 1 Use 2 Stake Pads BMS1119 to shim under the door posts as required to level the door header BMS1119 included in Door Frame Assembly EZ2011...

Страница 22: ...he frames starting from the bottom being certain to slide the tops under the tabs in the front of the bottom level This braces the interior supports from sliding out of position Continue to lay the mi...

Отзывы: