background image

 

Politec S.r.l. | Manual SADRIN – Ver. 3.3 

 

3.

 

INSTALLATION 

 
Adjust beams height by loosening screws on the boards, and positioning at requested height, make connections 
to terminal blocks and seal cable passages to prevent entry of water and insects. 
Make sure all boards screws are tightened so that there is a physical contact between boards and aluminum 
profile, to obtain an electric screening for prevent interferences. 
 
Select and activate, through dip switches, the number of beams installed in barrier. 
 

 

 

Make sure that expansions are properly connected (OUT>IN). 

BEAM: move ON DIPSWITCH up to 
corresponding number of expansions present 
in barriers. The missed activation of  
DIPSWITCH exclude relative beam operation. 
(Example: 6 expansions added) 
 

AND

in ON

 

activates double-beam detection 

(time delay 500 msec) 

FAST

: single-beam detection  

(with faster time delay 100 msec) 

Board fixing screw 

LED SYNC

: indicates the operation of the 

synchronism 

Содержание SADRIN

Страница 1: ...Installation manual...

Страница 2: ...and relay opening Dovetail on aluminum profile allows you to insert or remove polycarbonate front cover without remove barriers from wall It is possible to adjust beams position at required height by...

Страница 3: ...and remove IR plastic profile for aluminum If you need to shorten profile cut it paying attention to avoid that any metal slag falls onto boards 3 Insert square gasket in base cap 4 Insert the cable...

Страница 4: ...nt on base cap and or on cover to allow cable insertion from outside barrier BUILT IN CABLE PASSAGE VISIBLE CABLE PASSAGE Round grooves on base cap for cable passage Grooves on base cap walls for cabl...

Страница 5: ...re drainage of rainwater that could accumulate inside closure 9 Fix to wall all structure it is possible to adjust position of column horizontally and vertically through slots on base caps 10 After in...

Страница 6: ...tain an electric screening for prevent interferences Select and activate through dip switches the number of beams installed in barrier Make sure that expansions are properly connected OUT IN BEAM move...

Страница 7: ...port an ALARM event signaled by RED LED and relay opening After test complete installation choosing desired operation mode for the barrier as shown in table below After programming if desired is possi...

Страница 8: ...and alarm relay you MUST connect transmitter side to receiver SADRIN TX SADRIN RX with a two wire for the synchronization sync TX to SincRX sync TX to sync RX Only for expansions MUST be set in ON a...

Страница 9: ...f each column 6 TECHNICAL FEATURES MODEL SADRIN 205 SADRIN 410 SADRIN 615 SADRIN 820 Max range outdoor Black 15m White 5m Synchronism wired Dual beam optical Yes with 35mm lenses in AND Max configurat...

Страница 10: ...ves false alarms Make sure no animals or obstacles are interesting beams range in case not if possible activate AND operation mode Make sure receiver column is not perpendicularly stricken by sunrays...

Страница 11: ...Politec S r l Manual SADRIN Ver 3 3 11...

Страница 12: ...Politec S r l Manual SADRIN Ver 3 3 12...

Отзывы: