![Politec Parvis Solar SMA Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/politec/parvis-solar-sma/parvis-solar-sma_installation-and-mounting-manual_1574067009.webp)
9
PARVIS SL SMA
POLITEC | INSTALLATION MANUAL - VER.3.0
7.Mounting the base on the cable pit
If you want to finish the column with a light fitting, it is recommended to pass the power cable
through one of the cable glands mounted on the cover under the base, leaving enough cable inside
the cable pit and insert the cable in the cavity behind the column, up to the top, in order to make the
connections.
Cable entry base cover with OR sealing.
Once the necessary cables have been passed through, the bottom cover is fixed with the screws
supplied along with the corresponding gasket.
At the end of the operation, position the column on the cable pit and secure it with the bolts provided,
taking roughly into account the directions of the optics.
Cap fixing screw.
Using the cap screws it is
possible to rotate the plastic
profile by 120° at a time in
order to expose the solar panel
as much as possible to the
midday sun.
N.B.It is recommended to ALWAYS use the base cover and close any unused holes for cable passage
with the cable glands.