![Polaris 2009 Ranger RZR 800 EFI Скачать руководство пользователя страница 292](http://html1.mh-extra.com/html/polaris/2009-ranger-rzr-800-efi/2009-ranger-rzr-800-efi_manual_1572466292.webp)
9.18
BRAKES
Caliper Assembly
1.
Install new caliper seals (A) in the caliper body (B). Be
sure groove is clean and free of residue or brakes may drag
upon assembly.
2.
Coat piston with clean Polaris DOT 4 Brake Fluid
(PN
2872189)
. Install piston (D) with a twisting motion while
pushing inward. Piston should slide in and out of bore
smoothly with light resistance.
3.
Lubricate the mounting bracket pins with Polaris Premium
All Season Grease (
PN 2871423
), and install the rubber
dust seal boots.
4.
Compress the mounting bracket and make sure the dust
seals are fully seated. Install the brake pads. Clean the disc
and pads with brake parts cleaner or denatured alcohol to
remove any dirt, oil or grease.
Caliper Installation
5.
Install the rear caliper with the mounting bolts. Torque
mounting bolts to
18 ft. lbs. (24 Nm)
.
6.
Install brake line banjo bolt and torque to specification.
7.
Install the pad adjustment screw and turn until stationary
pad contacts disc, then back off 1/2 turn.
8.
Perform brake bleeding procedure as outlined earlier in this
chapter.
9.
Install wheel and torque wheel nuts to specification.
NOTE: If new brake pads are installed, brake
burnishing is recommended (see “REAR BRAKE
PADS - Brake Burnishing Procedure”).
Polaris Premium All Season Grease
(PN 2871423)
A
B
D
=
T
Rear Caliper Mount Bolt Torque:
18 ft. lbs. (24 Nm)
=
T
Rear Wheel Nut Torque:
27 ft. lbs. (37 Nm)
18 ft. lbs.
(24 Nm)
15 ft. lbs.
(21 Nm)
Содержание 2009 Ranger RZR 800 EFI
Страница 10: ...1 10 GENERAL INFORMATION SAE Tap Drill Sizes Metric Tap Drill Sizes Decimal Equivalents ...
Страница 12: ...NOTES GENERAL INFORMATION 1 12 ...
Страница 19: ...2 7 MAINTENANCE 2 RH and LH Side Views Standard RZR Only Standard RZR Shown Standard RZR Shown ...
Страница 46: ...2 34 MAINTENANCE MAINTENANCE LOG Service Date Hours Miles km Service Performed Comments Dealer Technician ...
Страница 48: ...3 2 ENGINE ENGINE SPECIFICATIONS Crankcase Exploded Views ...
Страница 49: ...3 3 ENGINE 3 Oil Pump Water Pump Engine Cover Exploded View ...
Страница 50: ...3 4 ENGINE Stator Cover Starter Water Pump Oil Filter Pressure Relief Exploded View ...
Страница 51: ...3 5 ENGINE 3 Cylinder Cylinder Head Piston Exploded View ...
Страница 140: ...4 32 ELECTRONIC FUEL INJECTION Fuel Injector PTO Circuit Fuel Injector MAG Circuit ...
Страница 141: ...4 33 ELECTRONIC FUEL INJECTION 4 Engine Coolant Temperature Sensor ECT Circuit Engine Overheat Lamp Driver Circuit ...
Страница 143: ...4 35 ELECTRONIC FUEL INJECTION 4 Throttle Position Sensor TPS Circuit Fuel Pump Circuit ...
Страница 144: ...NOTES ELECTRONIC FUEL INJECTION 4 36 ...
Страница 182: ...NOTES BODY STEERING SUSPENSION 5 38 ...
Страница 274: ...8 20 TRANSMISSION TRANSMISSION EXPLODED VIEWS Shift Housing Transfer Case Exploded View Transfer Case Shift Housing ...
Страница 311: ...10 17 ELECTRICAL 10 COOLING SYSTEM SCHEMATIC Cooling System Break Out Diagram ...
Страница 326: ...10 32 ELECTRICAL ELECTRICAL BREAKOUT DIAGRAMS 12V Key On Power Circuit Starting System Circuit ...
Страница 327: ...10 33 ELECTRICAL 10 Instrument Cluster Circuit Transmission Switch Circuit ...
Страница 328: ...10 34 ELECTRICAL Wheel Speed Sensor Circuit AWD Circuit ...
Страница 329: ...10 35 ELECTRICAL 10 Fuel Gauge Display Circuit Cooling Fan Circuit ...
Страница 330: ...10 36 ELECTRICAL Charging System Circuit ...
Страница 331: ...WD 1 WIRE DIAGRAM 2009 RANGER RZR RZR S PAGE 1 OF 2 ...
Страница 332: ...WD 2 WIRE DIAGRAM 2009 RANGER RZR RZR S PAGE 2 OF 2 ...