5.3
BODY / STEERING / SUSPENSION
5
CAB FRAME (RZR)
Assembly / Removal
NOTE: Finger tighten all components until cab frame is completely assembled on vehicle, then tighten to
specifications listed.
1.
Assemble the rear cab frame and the front cab frame at the coupler joints and secure with four (3/8-16 x 1 1/4) screws and
(3/8-16 Nyloc) nuts. Tighten screws to 25-28 ft. lbs. (34-38 Nm).
2.
Place the assembled cab frame onto the vehicle and align the rear mount holes. Fasten the rear cab frame brackets to vehicle
with four (5/16-18) bolts and (5/16-18) nuts. Tighten bolts to 16-18 ft. lbs. (22-24 Nm). Fasten the two self-tapping screws
to the rear inner portion of the bracket on each side. Tighten screws to 15 ft. lbs. (20 Nm).
3.
Place the straps from the safety net over the front coupler posts.
4.
Fasten the front of the cab frame to the base brackets and secure with four (3/8-16 x 1 1/4) screws and (3/8-16 Nyloc) nuts.
Tighten screws to 25-28 ft. lbs. (34-38 Nm).
5.
Attach the upper side bars to the cab frame. Do not fully tighten at this time.
6.
Fasten the upper side bars to the lower side bars. Tighten the upper screws to 8-9 ft. lbs. (11-12 Nm), then tighten the lower
screws to 8-9 ft. lbs. (11-12 Nm).
7.
To remove the cab frame, reverse the assembly procedure (steps 1-6).
Содержание 2009 Ranger RZR 800 EFI
Страница 10: ...1 10 GENERAL INFORMATION SAE Tap Drill Sizes Metric Tap Drill Sizes Decimal Equivalents ...
Страница 12: ...NOTES GENERAL INFORMATION 1 12 ...
Страница 19: ...2 7 MAINTENANCE 2 RH and LH Side Views Standard RZR Only Standard RZR Shown Standard RZR Shown ...
Страница 46: ...2 34 MAINTENANCE MAINTENANCE LOG Service Date Hours Miles km Service Performed Comments Dealer Technician ...
Страница 48: ...3 2 ENGINE ENGINE SPECIFICATIONS Crankcase Exploded Views ...
Страница 49: ...3 3 ENGINE 3 Oil Pump Water Pump Engine Cover Exploded View ...
Страница 50: ...3 4 ENGINE Stator Cover Starter Water Pump Oil Filter Pressure Relief Exploded View ...
Страница 51: ...3 5 ENGINE 3 Cylinder Cylinder Head Piston Exploded View ...
Страница 140: ...4 32 ELECTRONIC FUEL INJECTION Fuel Injector PTO Circuit Fuel Injector MAG Circuit ...
Страница 141: ...4 33 ELECTRONIC FUEL INJECTION 4 Engine Coolant Temperature Sensor ECT Circuit Engine Overheat Lamp Driver Circuit ...
Страница 143: ...4 35 ELECTRONIC FUEL INJECTION 4 Throttle Position Sensor TPS Circuit Fuel Pump Circuit ...
Страница 144: ...NOTES ELECTRONIC FUEL INJECTION 4 36 ...
Страница 182: ...NOTES BODY STEERING SUSPENSION 5 38 ...
Страница 274: ...8 20 TRANSMISSION TRANSMISSION EXPLODED VIEWS Shift Housing Transfer Case Exploded View Transfer Case Shift Housing ...
Страница 311: ...10 17 ELECTRICAL 10 COOLING SYSTEM SCHEMATIC Cooling System Break Out Diagram ...
Страница 326: ...10 32 ELECTRICAL ELECTRICAL BREAKOUT DIAGRAMS 12V Key On Power Circuit Starting System Circuit ...
Страница 327: ...10 33 ELECTRICAL 10 Instrument Cluster Circuit Transmission Switch Circuit ...
Страница 328: ...10 34 ELECTRICAL Wheel Speed Sensor Circuit AWD Circuit ...
Страница 329: ...10 35 ELECTRICAL 10 Fuel Gauge Display Circuit Cooling Fan Circuit ...
Страница 330: ...10 36 ELECTRICAL Charging System Circuit ...
Страница 331: ...WD 1 WIRE DIAGRAM 2009 RANGER RZR RZR S PAGE 1 OF 2 ...
Страница 332: ...WD 2 WIRE DIAGRAM 2009 RANGER RZR RZR S PAGE 2 OF 2 ...