3.59
ENGINE
3
1.
After the engine is completely assembled and ready for
installation, the engine must be properly primed with
Polaris PS-4 PLUS 2W-50 Synthetic Oil
(PN 2876244)
.
Fill the oil filter three-quarters full with Polaris PS-4 PLUS
2W-50 Synthetic Oil
(PN 2876244)
. Let the oil soak into
the filter for 8-10 minutes. Install the filter onto the engine.
2.
Remove primer plug from the engine. Install Oil System
Priming Adapter
(PU-45778)
into the oil plug hole. Push
3-5 oz. (approx.) of Polaris PS-4 PLUS 2W-50 engine oil
into the adapter or until resistance is felt. Remove the
adapter. Apply sealant to the plug threads. Install the plug
and torque to specification.
ENGINE INSTALLATION
Engine Assembly and Installation
Use the following procedure to reinstall the engine assembly.
Assemble the engine to the transmission on a work bench prior
to installation.
1.
Support the transmission / rear gearcase assembly while
setting the engine in place.
2.
Lightly tighten all fasteners evenly to eliminate any gaps
that may be present in the mounting areas.
3.
Torque fasteners to specification using a 2 part sequence.
• Torque fasteners to half of the specified torque value
• Then torque fasteners to the full specified torque value
Install the inner clutch cover, drive clutch, and driven clutch.
Torque to specification (see Chapter 6).
• Clean clutch sheaves thoroughly and inspect inlet and
outlet ducts for proper routing and sealing.
To install engine assembly, reverse the “Engine Removal”
procedure detailed earlier in this Chapter.
• Properly route all electrical harnesses for engine
assembly installation. Check for any possible rubbing
points of electrical wires.
=
T
Primer Plug Torque
18
±
2 ft.lbs. (24.4
±
2.71 Nm)
Fill 3/4 full
with PS-4 PLUS
PU-45778
=
T
Engine / Transmission Mounting Fasteners
(2) Lower 3/8” Nuts: 40 ft. lbs. (54 Nm)
(4) Outer M8 Bolts: 28 ft. lbs. (38 Nm)
40 ft. lbs.
(54 Nm)
28 ft. lbs.
(38 Nm)
Plate is shown detached
from transmission for clarity
Содержание 2009 Ranger RZR 800 EFI
Страница 10: ...1 10 GENERAL INFORMATION SAE Tap Drill Sizes Metric Tap Drill Sizes Decimal Equivalents ...
Страница 12: ...NOTES GENERAL INFORMATION 1 12 ...
Страница 19: ...2 7 MAINTENANCE 2 RH and LH Side Views Standard RZR Only Standard RZR Shown Standard RZR Shown ...
Страница 46: ...2 34 MAINTENANCE MAINTENANCE LOG Service Date Hours Miles km Service Performed Comments Dealer Technician ...
Страница 48: ...3 2 ENGINE ENGINE SPECIFICATIONS Crankcase Exploded Views ...
Страница 49: ...3 3 ENGINE 3 Oil Pump Water Pump Engine Cover Exploded View ...
Страница 50: ...3 4 ENGINE Stator Cover Starter Water Pump Oil Filter Pressure Relief Exploded View ...
Страница 51: ...3 5 ENGINE 3 Cylinder Cylinder Head Piston Exploded View ...
Страница 140: ...4 32 ELECTRONIC FUEL INJECTION Fuel Injector PTO Circuit Fuel Injector MAG Circuit ...
Страница 141: ...4 33 ELECTRONIC FUEL INJECTION 4 Engine Coolant Temperature Sensor ECT Circuit Engine Overheat Lamp Driver Circuit ...
Страница 143: ...4 35 ELECTRONIC FUEL INJECTION 4 Throttle Position Sensor TPS Circuit Fuel Pump Circuit ...
Страница 144: ...NOTES ELECTRONIC FUEL INJECTION 4 36 ...
Страница 182: ...NOTES BODY STEERING SUSPENSION 5 38 ...
Страница 274: ...8 20 TRANSMISSION TRANSMISSION EXPLODED VIEWS Shift Housing Transfer Case Exploded View Transfer Case Shift Housing ...
Страница 311: ...10 17 ELECTRICAL 10 COOLING SYSTEM SCHEMATIC Cooling System Break Out Diagram ...
Страница 326: ...10 32 ELECTRICAL ELECTRICAL BREAKOUT DIAGRAMS 12V Key On Power Circuit Starting System Circuit ...
Страница 327: ...10 33 ELECTRICAL 10 Instrument Cluster Circuit Transmission Switch Circuit ...
Страница 328: ...10 34 ELECTRICAL Wheel Speed Sensor Circuit AWD Circuit ...
Страница 329: ...10 35 ELECTRICAL 10 Fuel Gauge Display Circuit Cooling Fan Circuit ...
Страница 330: ...10 36 ELECTRICAL Charging System Circuit ...
Страница 331: ...WD 1 WIRE DIAGRAM 2009 RANGER RZR RZR S PAGE 1 OF 2 ...
Страница 332: ...WD 2 WIRE DIAGRAM 2009 RANGER RZR RZR S PAGE 2 OF 2 ...