9.15
BRAKES
9
Pad Inspection
1.
Clean the caliper with brake cleaner or alcohol.
2.
Measure the thickness of the pad material. Replace pads if
worn beyond the service limit.
Pad Assembly / Installation
1.
Lubricate mounting bracket pins with a light film of
Polaris Premium All Season Grease (
PN 2871423
), and
install rubber dust boots.
2.
Compress mounting bracket and make sure dust boots are
fully seated. Install pads with friction material facing each
other.
3.
Install caliper and torque mounting bolts to specification.
4.
Slowly pump the brake pedal until pressure has been built
up. Maintain at least 1/2, (12.7 mm) of brake fluid in the
reservoir to prevent air from entering the brake system.
5.
Install the adjustment set screw and turn clockwise until the
stationary pad contacts the disc, then back off 1/2 turn
(counterclockwise).
6.
Verify fluid level in reservoir is up to the MAX line inside
reservoir and install reservoir cap.
7.
Install wheel and torque wheel nuts.
Brake Burnishing Procedure
It is required that a burnishing procedure be performed after
installation of new brake pads to extend service life and reduce
noise.
Start machine and slowly increase speed to 30 mph. Gradually
apply brakes to stop machine. Allow pads and disc to cool
sufficiently during the procedure. Do not allow pads or disc to
become hot or warping may result. Repeat this procedure 10
times.
Rear Brake Pad Thickness
New .298” ± .007” (7.57 mm ± .178 mm)
Service Limit .180” (4.6 mm)
WARNING
If brake pads are contaminated with grease,
oil, or liquid soaked do not use the pads.
Use only new clean pads.
Measure
Thickness
=
T
Rear Caliper Mount Bolt Torque:
18 ft. lbs. (24 Nm)
Master Cylinder Fluid
Up to MAX line inside reservoir
=
T
Rear Wheel Nut Torque:
27 ft. lbs. (37 Nm)
18 ft. lbs.
(24 Nm)
Содержание 2009 Ranger RZR 800 EFI
Страница 10: ...1 10 GENERAL INFORMATION SAE Tap Drill Sizes Metric Tap Drill Sizes Decimal Equivalents ...
Страница 12: ...NOTES GENERAL INFORMATION 1 12 ...
Страница 19: ...2 7 MAINTENANCE 2 RH and LH Side Views Standard RZR Only Standard RZR Shown Standard RZR Shown ...
Страница 46: ...2 34 MAINTENANCE MAINTENANCE LOG Service Date Hours Miles km Service Performed Comments Dealer Technician ...
Страница 48: ...3 2 ENGINE ENGINE SPECIFICATIONS Crankcase Exploded Views ...
Страница 49: ...3 3 ENGINE 3 Oil Pump Water Pump Engine Cover Exploded View ...
Страница 50: ...3 4 ENGINE Stator Cover Starter Water Pump Oil Filter Pressure Relief Exploded View ...
Страница 51: ...3 5 ENGINE 3 Cylinder Cylinder Head Piston Exploded View ...
Страница 140: ...4 32 ELECTRONIC FUEL INJECTION Fuel Injector PTO Circuit Fuel Injector MAG Circuit ...
Страница 141: ...4 33 ELECTRONIC FUEL INJECTION 4 Engine Coolant Temperature Sensor ECT Circuit Engine Overheat Lamp Driver Circuit ...
Страница 143: ...4 35 ELECTRONIC FUEL INJECTION 4 Throttle Position Sensor TPS Circuit Fuel Pump Circuit ...
Страница 144: ...NOTES ELECTRONIC FUEL INJECTION 4 36 ...
Страница 182: ...NOTES BODY STEERING SUSPENSION 5 38 ...
Страница 274: ...8 20 TRANSMISSION TRANSMISSION EXPLODED VIEWS Shift Housing Transfer Case Exploded View Transfer Case Shift Housing ...
Страница 311: ...10 17 ELECTRICAL 10 COOLING SYSTEM SCHEMATIC Cooling System Break Out Diagram ...
Страница 326: ...10 32 ELECTRICAL ELECTRICAL BREAKOUT DIAGRAMS 12V Key On Power Circuit Starting System Circuit ...
Страница 327: ...10 33 ELECTRICAL 10 Instrument Cluster Circuit Transmission Switch Circuit ...
Страница 328: ...10 34 ELECTRICAL Wheel Speed Sensor Circuit AWD Circuit ...
Страница 329: ...10 35 ELECTRICAL 10 Fuel Gauge Display Circuit Cooling Fan Circuit ...
Страница 330: ...10 36 ELECTRICAL Charging System Circuit ...
Страница 331: ...WD 1 WIRE DIAGRAM 2009 RANGER RZR RZR S PAGE 1 OF 2 ...
Страница 332: ...WD 2 WIRE DIAGRAM 2009 RANGER RZR RZR S PAGE 2 OF 2 ...