– 6 –
Manual P5/EP5 23740/98.10
Storage Seal
P5/EP5 is supplied with all enclosure entry
points sealed.The seal is only a storage seal, not
to be used as seal when P5/EP5 is in operation.
If Storage Seal is removed or damaged, make
sure all open enclosure entry points are proper
resealed before further shipping or storage.
Use circular stickers marked I, S and OUT,
supplied on Storage Seal or vapour proof tape.
P5
Remove Storage Seal from connection block,
mount positioner on actuator/valve, make
connections according to section 5, (Page 9).
Calibrate span and Zero according to section 7,
(Page 11).
Clean any oil/debris off the connecting block,
then reseal open enclosure entry ports, use
circular stickers marked I, S and OUT, supplied
on Storage Seal or vapour proof tape.
EP5
Follow P5 instructions as above. Remove
Storage Seal for conduit entry I
E
,
connect input
signal cable and install proper cable gland to
secure the units sealing.
IP5-SEAL
P5-SEAL
Содержание EP5
Страница 1: ... 1 Manual P5 EP5 23740 98 10 Manual P5 EP5 PMV Valve Control System alve Control System ...
Страница 22: ... 22 Manual P5 EP5 23740 98 10 17 Exploded Drawing 98 9 84 ...
Страница 24: ... 24 Manual P5 EP5 23740 98 10 Approvals E5 IS EU ...
Страница 25: ... 25 Manual P5 EP5 23740 98 10 Approvals E5 EX EU ...
Страница 26: ... 26 Manual P5 EP5 23740 98 10 Approvals E5 IS US E5 EX US 1 ...
Страница 27: ... 27 Manual P5 EP5 23740 98 10 Approvals E5 IS US E5 EX US 2 ...
Страница 29: ... 29 Manual P5 EP5 23740 98 10 FM ...
Страница 30: ... 30 Manual P5 EP5 23740 98 10 CSA ...
Страница 31: ... 31 Manual P5 EP5 23740 98 10 CENELEC ...