Along with the completed G83/2 SSEG Installation Commissioning Confirmation Form, you must
also supply the DNO with the following:
1.
An electrical schematic diagram for your installation (A relevant electrical schematic diagram will be
provided with your Plug-In Solar Kit). An example can be seen in Appendix 3.
2.
A copy of the G83/2 SSEG Test Report Certificate for the Micro-Inverters (This can be found in
Appendix 7)
3.
A photograph of your existing electricity meter (be sure to include the make and model of the meter)
Email/Fax/Post the information above to your DNO using the contact supplied on the
Commissioning Form. Do not send it to Plug-In Solar, we cannot apply to the DNO on your behalf.
When the DNO has received your form and it has been processed, you will get a confirmation
email/letter to say it has been accepted.
Notifying the DNO of changes to a Plug-In Solar kit
If during the lifetime of the Plug-In Solar kit it is necessary to replace a major component of the
Plug-In Solar kit, it is only necessary to notify the DNO if the operating characteristics of the Plug-In
Solar kit or the Plug-In Solar Connection Unit have been altered when compared against the unit
that was originally commissioned.
Notifying the DNO of the decommissioning of a Plug-In Solar kit
In the event that a Plug-In Solar kit is to be decommissioned and will no longer operate as a
source of electrical energy in parallel with the DNO’s Distribution System, you must notify the DNO
by completing a G83/2 SSEG Decommissioning Confirmation Form. Please contact your DNO for
a copy of this form.