10
6.
Maintenance
The Ceiling Hoist must be inspected in accordance with NEN-EN-ISO 10535:2006 once per
year. The chargers must also be inspected annually based on the applicable conditions. The
daily and weekly inspection will be carried out by the users and is described in the manual.
6.1.
Advice
We as PLS BV recommend the following in addition to the annual mandatory maintenance:
•
Replace the Batteries every 24 months (
chapters 7.2 and 7.3
). This aims to prevent errors/improper
operation.
•
Replace the Lifting Tape every 24 months (
chapters 7.5 and 7.6
). Notify the date on the Inspection
and Maintenance form.
•
The Lifting Tape must be checked during every inspection.
6.2.
Six-month maintenance
The following actions must be carried out during the six-month maintenance:
•
Check the listed Inspection Requirements set out in the Manual.
•
Check for potential damage.
•
Check the wiring.
•
Check the smooth operation in the rail.
•
Check the installation equipment, brackets etc.
•
Check the rail for damage and fixing points.
•
Lubricate the gearwheels with, advice; Kroon Oil Lithep Grease EP2 of a comparable grease.
6.3.
Annual inspection
The annual inspection consists of an inspection and maintenance form (
Annex 10.4
) based on the
requirements set out in NEN-EN-ISO 10535:2006.