background image

The Bracket is secured to the Tray, under the Module 

Stop Bracket using the existing Flange Nut. Torque to 

15 ft.-lbs. 

Using the hardware provided in the Bracket Kit, attach 

the Snake Tray to the Bracket using 5/16 x 3/4” Hex 

Screw, Flat Washer and Flange Nut.  

Tighten securely.

For more on Snake Tray see: 

snaketray.com

The Z-Bracket Kit may be secured to either the Front 

Bracket (as shown) or the Rear Bracket using the 

existing Flange Nut. Torque to 15 ft.-lbs. 

Using the hardware provided in the Z-Bracket Kit, attach 
the Ratchet P-Clamp to the Z-Bracket.  
Tighten securely.

For more on Ratchet P-Clamps see: 

hellermanntyton.us

POWER MAX

TM

 Accessories Installation Guide, Tilted (5°, 10°), Dual Tilt and Flush Arrays

Installing Snake Tray

®

 - Cable Runs (cont.)

Flush Array

Tilted (5° & 10°) Array - Utilizing PLP’s Z-Bracket Kit

Installing Ratchet P-Clamps - Conduit & Cable Runs

Snake Tray

®

 is a registered trademark owned by Cable Management Solutions.

POWER MAX™ Accessories Installation Guide, Tilted (5°, 10°), Dual Tilt and Flush Arrays 

Snake Tray

®

 is a registered trademark owned by Cable Management Solutions.

3

Содержание POWER MAX Dual Tilt Array

Страница 1: ...POWER MAXTM Accessories Tilted 5 10 Dual Tilt Flush Arrays Installation Guide SP3470 1 ...

Страница 2: ...his product is intended for use by trained technicians only This product should not be used by anyone who is not familiar with and not trained to use it When working in the area of energized lines extra care should be taken to prevent accidental electrical contact Be sure to wear proper safety equipment per your company protocol For proper performance and personal safety be sure to select the prop...

Страница 3: ...y 4 Installing PipeGuard Conduit Support All Systems 5 Installing a Microinverter Optimizer Tilted 5 10 Array only 5 Installing Roof Protection Pads All Systems 6 Installing Deflectors Tilted 10 Array only 6 Installing High Load Brackets Tilted 5 10 Array and Dual Tilt Array 7 Installing Unistrut Rail For Excessive Loads Only Tilted 5 10 Array only 8 Installing Seismic Attachments All Systems 10 1...

Страница 4: ... on top of the Valley Bracket as shown using the existing Flange Nut Torque to 15 ft lbs Using the hardware provided in the Z Bracket Kit attach the Snake Tray Bracket to the Z Bracket Tighten securely Attach the Snake Tray to the Bracket using 5 16 x 3 4 Hex Screw Flat Washer and Flange Nut Tighten securely For more on Snake Tray see snaketray com Snake Tray is a registered trademark owned by Cab...

Страница 5: ...e Front Bracket as shown or the Rear Bracket using the existing Flange Nut Torque to 15 ft lbs Using the hardware provided in the Z Bracket Kit attach the Ratchet P Clamp to the Z Bracket Tighten securely For more on Ratchet P Clamps see hellermanntyton us POWER MAXTM Accessories Installation Guide Tilted 5 10 Dual Tilt and Flush Arrays Installing Snake Tray Cable Runs cont Flush Array Tilted 5 10...

Страница 6: ...ay above right If attaching to the Module Stop Bracket secure the Ratchet P Clamp using the existing Flange Nut Torque to 15 ft lbs For the Tray attachment use the hardware provided in the Z Bracket Kit Secure the Z Bracket to the Tray and then secure the Ratchet P Clamp to the top of the Z Bracket Torque to 15 ft lbs For more on Ratchet P Clamps see hellermanntyton us POWER MAXTM Accessories Inst...

Страница 7: ...ion and source For more on PipeGuard see omgroofing com Attach the Mounting Bracket under the Front Bracket using the existing Flange Nut Torque to 15 ft lbs Using the hardware provided in the Mounting Bracket Kit attach the Microinverter Optimizer to the underside of the Mounting Bracket Tighten securely POWER MAX Accessories Installation Guide Tilted 5 10 Dual Tilt and Flush Arrays Installing Pi...

Страница 8: ... as needed then tighten the Flange Nuts Torque to 15 ft lbs Insert the Backing Plate through the Back Bracket and the overlapping Deflectors Thread on 5 16 Flange Nuts Adjust the Deflectors from side to side as needed then tighten the Flange Nuts Torque to 15 ft lbs POWER MAX Accessories Installation Guide Tilted 5 10 Dual Tilt and Flush Arrays Installing Roof Protection Pads All Systems Installin...

Страница 9: ... Arrays Installing High Load Brackets Tilted 5 10 and Dual Tilt Array High Load Brackets are used in those areas where heavy snow loads or other conditions require additional Module support NOTE 1 Orient the High Load Bracket as shown aligning its notches with the upright tabs of the Module Bracket 2 Install the Modules and the AMP Clamp per Assembly Instructions se curing High Load Bracket in pla...

Страница 10: ...s of 30 psf 650 lbs module Unistrut Rails are only needed on Tilted 5 10 systems with excessive loads Dual Tilt systems utilize a shared Peak Bracket which prevents any outside edge rows from slipping under excessive loads NOTE Item Description Qty Supplied By 1 3 8 x 1 1 4 Hex Bolt Lockwasher Stainless Steel 4 Customer 2 Channel Nut Unistrut p n P3008 or Equivalent 2 Customer 3 Square Washer Unis...

Страница 11: ... the Module mounting holes and install the Module End Clamps on the long edge of the Module POWER MAX Accessories Installation Guide Tilted 5 10 Dual Tilt and Flush Arrays Installing Unistrut Rails Tilted 5 10 Array cont 9 ...

Страница 12: ... the Ballast Trays and position N S to accommodate roof attachment locations As needed Splice Unistrut sections together Torque to 20 ft lbs Secure the Unistrut to the Ballast Trays it s only necessary to secure the north end of each Ballast Tray Torque to 20 ft lbs Install secure the Roof Anchor to the rooftop Secure the Unistrut to the Roof Anchor with the Seismic Attachment and hardware Torque ...

Страница 13: ...11 ...

Страница 14: ...12 ...

Страница 15: ...13 ...

Страница 16: ...Global Headquarters 660 Beta Drive Mayfield Village OH 44143 Telephone 440 461 5200 Fax 440 442 8816 preformed com info plpsolar com 2020 Preformed Line Products SP3470 1 ...

Отзывы: