
Install two High Load
Brackets for each set
of Modules. Place
one Bracket under the
lower (as shown) and
one under the upper
edge of each set of
two Modules.
POWER MAX™ Accessories Installation Guide, Tilted (5°, 10°), Dual Tilt and Flush Arrays
Installing High Load Brackets - Tilted (5° & 10°), and Dual Tilt Array
High Load Brackets
are used in those
areas where heavy
snow loads or other
conditions require
additional Module
support.
NOTE
1. Orient the High
Load Bracket as
shown, aligning
its notches with
the upright tabs
of the Module
Bracket.
2. Install the
Modules and the
AMP™ Clamp
per Assembly
Instructions, se-
curing High Load
Bracket in place
underneath the
Modules.
POWER MAX™ Accessories Installation Guide, Tilted (5°, 10°), Dual Tilt and Flush Arrays
7
Содержание POWER MAX Dual Tilt Array
Страница 1: ...POWER MAXTM Accessories Tilted 5 10 Dual Tilt Flush Arrays Installation Guide SP3470 1 ...
Страница 13: ...11 ...
Страница 14: ...12 ...
Страница 15: ...13 ...