![PlexBio IntelliPlex IW100 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/plexbio/intelliplex-iw100/intelliplex-iw100_user-manual_1567829036.webp)
33
IntelliPlex
TM
1000
Code User Manual - Jan-20
6.1.1 Renew U Tray
There are two tanks - the washing tank (U Tray) and the SA-PE tank (V Tray) (Fig. 27). Only the
transparent U and V Tray is replaceable, do not tamper with the fixed white tank modules from
the instrument. We recommend replacing the U Tray once a month to keep the tray clean and
reduce the possibility of salts crystal formation or contamination. While the V Tray can be replaced
directly (please dispose/replace after every run), replacing the U Tray requires the maintenance
function in the settings menu.
Fig. 27. Positions of the Washing and SA-PE Tanks
To renew the U Tray, please follow the steps below:
Step 1.
Open the System Menu
Step 2.
Select Setting on the menu page.
Step 3.
Click on the Maintenance button.
Step 4.
Choose Renew U Tray (Fig. 28) and the manifold will move backwards to reveal the
washing tank for replacing the U Tray.
Step 5.
Please remove the plastic U Tray carefully and avoid spilling of any liquid that might still
be at the bottom of the tray.
Step 6.
Place a new tray into the white manifold. Ensure proper placement.
Note: It is recommended to renew U Tray once a month to reduce the possibility of contamination
or crystal formation.
Washing Tank (U Tray)
SA-PE Tank
(V Tray)
Содержание IntelliPlex IW100
Страница 19: ...16 IntelliPlexTM 1000 Code User Manual Jan 20 Fig 11 Procedures confirmation Fig 12 Pop up window confirmation...
Страница 20: ...17 IntelliPlexTM 1000 Code User Manual Jan 20 Fig 13 Real time display of the assay operation status...
Страница 30: ...27 IntelliPlexTM 1000 Code User Manual Jan 20 Fig 23 Custom Program Process and Real time Display...