background image

Model XX0483

PA1380

Page 7 of 8

Installation Instructions

Fasteners

•  Inspect for loose fasteners. 
  Tightening torque specifi cations are: 
  Bolts and Nuts:  Snug tighten and tighten an additional 

one-half turn.

•  If  during  the  maintenance  process  a  bolt  needs  to  be 

removed from a part or parts, it will be necessary to apply 
a  drop  of  liquid  thread  lock  /  loctite  to  the  bolt  before 
reinstallation.

•  Inspect  for  missing,  worn  or  broken  fasteners.  If  any 

missing, worn or broken fasteners are found, refer to the 
installation instructions for proper replacement fastener. 
If  any  damage  is  detected,  barricade  equipment  to 
prevent use until repair is completed. Contact your sales 
representative immediately for a replacement part.

Plastic Parts

•  Inspect  all  plastic  surfaces  for  sharp  points,  cracks 

or  jagged  edges.  If  any  damage  is  detected  and  is 
determined to be unsafe, barricade equipment to prevent 
use until repair is completed. Minor burrs or sharp edges 
may be removed by using a sharp utility knife or block 
plane to remove sharp burr.

Castings

•  Inspect the aluminum castings to insure they are properly 

secured to the component.

•  Visually inspect the castings for cracks or breakage. If 

any  damage  is  detected,  barricade  the  equipment  to 
prevent use until repair is completed. Contact your sales 
representative immediately for a replacement part.

Welds

•  Inspect all welded joints. If any broken welds are detected, 

barricade  equipment  to  prevent  use  until  repair  is 
completed. Contact your sales representative immediately 
for a replacement part.

Equipment Maintenance 

Playworld Systems

®

 Model XX0483

Cozy Cocoon

Spinning Post Mount

Finish

•  Inspect metal parts for fi nish damage. 
     To  repair  painted  surfaces,  sand  damaged  area  with 

sandpaper  and  wipe  clean.  Mask  area  and  paint  with 
primer  and  allow  to  dry.  Paint  primed  area  with  color-
matching paint and allow to dry. Recoat area with color-
matching paint if required. Drying time is approximately 
8 hours between coats.

Footings

•  Inspect component to be solid in footing and secure. If 

any damage is detected, barricade equipment to prevent 
use until repair is completed.

Surfacing

•  Refer to the specifi c surfacing maintenance detail sheet 

for additional information.

Replacement Parts

•  Refer to your installation instructions to obtain replacement 

part number.

•  Contact  your  sales  representative  or  call  Playworld 

Systems’ Customer Service for a replacement part.

1000 Buffalo Road • Lewisburg, PA  17837

www.playworldsystems.com

For Customer Service, Call

    

 

800-233-8404 or

               570-522-9800 

OUTSIDE U.S.

Содержание Cozy Cocoon

Страница 1: ...allation Time 1 5 man hours Concrete Required 0 13 cubic yard 0 10 cubic meters Use Zone Refer to information below User Group Age years ASTM CSA 2 12 EN 2 14 ICON KEY Fully Tighten Hardware Add 1 Dro...

Страница 2: ...stallation Instructions Model XX0483 PA1380 Page 2 of 8 685 1 9 Top View Elevation Views Footing Diagram ASTM CSA 14 356 mm EN 48 4 1245 mm KEY Position Unit of Measurement Top Inches Bottom Millimete...

Страница 3: ...er Casting AAU0718 1 Total Cocoon Half BPL3150 1 Total 3 8 x 2 3 4 Button Head Bolt BAE06677 3 Total 3 8 Button Head Nut BAE0663 3 Total Plastic Washer BPL0300 3 Total 3 8 Flat Washer BAE0595 3 Total...

Страница 4: ...Button Head Nut BAE0663 4 Total 3 8 Flat Washer BAE0595 4 Total 3 8 x 3 4 Button Head Bolt BAE0659 4 Total Detail C Step 6 Attach the cocoon support post to the cocoon post casting 3 8 x 2 3 4 Button...

Страница 5: ...s Snug tighten and then tighten an additional one half turn Step 5 Attach the cocoon halves together See Detail B Place the two cocoon halves together and attach as shown Fully tighten the connections...

Страница 6: ...6 x 1 63 BARREL 8 BAE0659 BOLT 3 8 16 x 3 4 BUTTON HEAD S S 4 BAE0663 NUT 3 8 16 x 7 16 BUTTON HEAD 10 BAE06675 BOLT 3 8 16 x 2 1 4 BUTTON HEAD S S 8 BAE06677 BOLT 3 8 16 x 2 3 4 BUTTON HEAD S S 6 BAE...

Страница 7: ...ks or breakage If any damage is detected barricade the equipment to prevent use until repair is completed Contact your sales representative immediately for a replacement part Welds Inspect all welded...

Страница 8: ...ke Repairer Name Please Print __________________________________ Signature ________________________________________ Date ___ ___ ___ MAINTENANCE SCHEDULE Item in Question Description of Problem Correc...

Страница 9: ...rfacing If adjacent play structures have a fall height greater than 30 inches 760 mm than the distance between the structures shall be no less than 108 in 2743 mm CSA compliance For rotating play equi...

Страница 10: ...commonly used hex key wrenches required to assemble your equipment You may also need shovel digging iron post hole digger steel rake wheelbarrow garden hoe water hose tape measure level alignment tool...

Страница 11: ...aries 36 914 mm Support Post Footing Detail ASTM CSA Ground Level Concrete Protective Surfacing Level Factory Applied Protective Surfacing Level Sticker Support Post 2b Stone End Cap from Post Shippin...

Страница 12: ...he support post in concrete Place the post directly on packed stone or other porous material The footings shown on Playworld Systems documentation are recommendations based on historical performance i...

Страница 13: ...est grade Adjust other footings accordingly Support posts and all attaching decks and play components must be plumb and level The footing size may vary due to local soil and weather conditions Base of...

Страница 14: ...ght dimensions Height measurements are taken from the top of the protective surfacing material Insure all fasteners are tightened according to tightening torque speci cations listed on your installati...

Отзывы: