35
SWING SEAT • GYM RINGS
1. Attach coated ends of chains onto play component using
Quick-Link Connectors provided. Tighten securely with
an adjustable wrench.
2. Hook uncoated ends of chain onto Swing Hangers
provided.
3. Customize the height of your
swing or gym rings
anywhere in the Adjustment Zone, to fit your child.
Warning: Failure to tighten Quick Links
securely could result in injury.
Adjustment
Zone
COMPONENTS – Mounting Instructions
Swing Chain Spacing:
10" minimum spacing is required from the closest
point of all other rides or stationary objects.
Gym Ring Chain Spacing:
11
¹|x
" minimum spacing is required from the closest
point of all other rides or stationary objects.
Fig. 1
front view
CLIMBING ROPE
1. Tie five knots, equally spaced, for climbing
grips.
(Fig. 1)
2. Insert rope through top hole and tie a knot
with 4" remaining.
3. Insert opposite end through bottom hole, pull
tight and tie a knot while
keeping rope snug.
4. Secure both ends
with staples provided
(2 each end).
(Fig. 2)
Fig. 2
back view
DISCOVERY
TELESCOPE
1. Determine
desired location
for pivot.
2. Drill
¹
/
₈
" diameter
pilot hole
1" deep.
3. Fasten pivot with #8 x 2
¹⁄x
"
deck screw provided.
4. Snap Discovery Telescope
onto pivot.
PLAY HANDLES
1. Position Play Handle
at desired location.
2. Mark pilot holes.
3. Drill
¹|₈
" holes 1" deep.
4. Secure with #14 x 1
¹|₄
"
pan head screws
provided.
SAND BOX SEAT
1. Position sand box seat as shown
2. Mark holes.
3. Drill
¹⁄₈
" holes 1" deep
into the boards.
4. Attach with
#14 x 1
¹⁄₄
"
pan head
screws.
Содержание Play Maker PS 7456
Страница 13: ...Cupola Template cut out used in Step 2 on Page 12 13...
Страница 14: ...14 This page Left Intentionally Blank...