background image

Call Toll Free 

1-888-752-9782

Customer Service:  Monday - Friday, 8:00 

A.M.

 to 5:00 

P.M.

 C.S.T.

We’re Here To Help!

Safety Guide & Building Instructions

PS 7456

Play Maker

TM

®

Front View

Pallet

Back View

Area Requirements

Содержание Play Maker PS 7456

Страница 1: ...Toll Free 1 888 752 9782 Customer Service Monday Friday 8 00 A M to 5 00 P M C S T We re Here To Help Safety Guide Building Instructions PS 7456 Play MakerTM Front View Pallet Back View Area Requirem...

Страница 2: ...inch depth of surfacing over time The surfacing will also compact displace and settle and should be periodically refilled to maintain at least a 9 inch depth Use containment such as digging out aroun...

Страница 3: ...t least 8 clear ance between the lowest point of component and top of shock absorbing surfacing material WARNING Lawn swings are designed for use by children two years of age and older Use by children...

Страница 4: ...er Tape Measure Safety Glasses Utility Knife Scissors Drill Driver 2 makes set up easier Saw Horses Optional Square Phillips Screwdriver Hammer Drill Bit Hex Bit Driver 2 3 Screw Bit Hack Saw Metal Fi...

Страница 5: ...Wall Roof Panel Left Cupola Swing Beam Picnic Table Tower Roof Panel Right Flower Box 3 Swing Beam Legs 1 2 x 4 x 74 1 2 x 4 x 28Z v 2 2 x 4 x 60 2 2 x 4 x 26Z x 1 2 x 4 x 35Z x 4 B v x 6 x 23M 2 2 x...

Страница 6: ...Handles 2 Corner Brackets 6 Sturdy Frame Brace 1 Climbing Bars 4 Climbing Rope 1 Scoop Slide 1 Stencil Kit 1 Roof Cap 2 Sand Box Seat 1 Design A Plaque 1 Sunlight Window 1 Swing Assembly Yellow 1 Magn...

Страница 7: ...tom of Flower Box T 25 Remove all screws from corner bracket on Cupola T 20 Remove slide in direction of the arrow Remove screws using T 20 bit supplied STEP 1 STEP 2 7 Note An effort has been made to...

Страница 8: ...Discard board Remove swing beam in direction of arrow Cut Zip Tie Cut band Remove Roof Panels in direction of arrow rotating the top first Cut bands on Roof Panels to Separate Remove screws attaching...

Страница 9: ...gs in direction of arrow STEP 5 STEP 6 9 SAVE BOARDS FOR LATER USE Remove Rock Wall in direction of arrow rotating the top first Remove boards from back of Rock Wall using T 20 bit supplied Remove Roc...

Страница 10: ...20 bit supplied SAVE BRACKETS FOR LATER USE Remove 2 x 4 x 28 1 4 and Picnic Table in direction of arrow SAVE 2 x 4 x 28 1 4 FOR LATER USE Cut band 2 x 4 x 28 1 4 Gently roll Tower to slide off pallet...

Страница 11: ...on roof sides together as shown Secure with 8 x 2 deck screws Position Roof Cap tight against boards as shown Use Roof Cap as a drill guide and drill Z holes 1 deep Keep boards square while attaching...

Страница 12: ...Tape template on the roof lining up the pencil edges Locate and mark the four hole locations as shown Drill Z holes through the roof Fig 2 Fig 1 Fig 2 Items for STEP 12 4 8 x 2 x deck screws Align th...

Страница 13: ...Cupola Template cut out used in Step 2 on Page 12 13...

Страница 14: ...14 This page Left Intentionally Blank...

Страница 15: ...crews Items for STEP 14 1 Flag Assembly 1 U Strap 2 14 x 1Z v pan head screws At the location shown drill a C hole at the top of the roof straight thru the roof as shown Fig 1 Your Design Your Design...

Страница 16: ...2 lock nuts 4 8 x 2 deck screws Bolt Screw Placement Detail Secure these corners Items for STEP 16 2 x 5 hex bolts 4 washers 2 lock nuts 4 8 x 2 deck screws Predrill 1 8 Dia for 8 x 21 2 deck screws...

Страница 17: ...imbing Bars at dimensions shown Use the bar as a drill guide and drill Z holes 1 deep into the board Attach with 14 x 1Z v pan head screws Lift tower upright and position in desired location Position...

Страница 18: ...as a drill guide and drill C holes completely through the boards Secure with x 2 hex bolts washers and lock nuts Attach rock wall to corner brackets as shown Bottom corner of 2 x 4 x 50Z x board must...

Страница 19: ...legs 1 2 x 4 x 60 board 1 2 x 4 x 74 board 8 8 x 2 deck screws Position assembly as shown Note Drilled ends of the Swing Beam legs at top Align the Swing Beam legs so that the outermost points measur...

Страница 20: ...at the short side No PlayStar logo is against the 2 x 4 x 60 board Use the bracket as a drill guide and drill holes 1 deep into the board Attach with 8 x 1 deck screws Again use the bracket as a drill...

Страница 21: ...s shown Fig 1 Position the A frame assembly so that the top leg is above the top bracket and the bottom leg is below the bot tom bracket Line up the holes in the brackets with the holes in the posts a...

Страница 22: ...ith a x 3 hex bolt washer and lock nut Locate the hole on the 2 x 4 board of tower assembly where the Swing Station Assembly will be attached Position Swing Station Assembly against tower and secure w...

Страница 23: ...he single bracket so that the holes of the bracket line up with the holes in the single post as shown Secure with x 3 hex bolts washers and lock nuts as shown Items for STEP 24 1 Swing Beam leg 2 x 3Z...

Страница 24: ...ckets as a drill guide and drill holes 1 deep into the board Attach with 8 x 1 deck screws Again use the corner brackets as a drill guide and drill holes completely through the boards Secure with hex...

Страница 25: ...h board with only one 8 x 2Z x deck screw in the hole closer to the outer edge Board should be able to pivot Items for STEP 26 1 Picnic table Items for STEP 27 2 2 x 4 x 30Z x boards 2 8 x 2Z x deck s...

Страница 26: ...x deck screws 56 56 2 x 4 x 35 21 10 10 2 x 4 x 26 2 x 4 x 26 2 x 4 x 60 2 x 4 x 35 Items for STEP 29 1 2 x 4 x 26Z x boards 12 8 x 2Z x deck screws From inside of Swing beam find center of 2 x 4 x 60...

Страница 27: ...egs as necessary to make sure table is level and legs are firmly resting on ground from underside of table Secure with 8 x 2Z x deck screws through the second holes left open during Step 27 Items for...

Страница 28: ...Center 2 x 4 x 60 board with Picnic Table and level with 2 x 4 x 74 board Drill 2 two Z holes on each leg as shown in Inside View below Secure with 8 x 2Z x deck screws Items for STEP 31 1 2 x 4 x 60...

Страница 29: ...s shown Secure with 8 x 2 deck screws Attach second B v x 6 x 23M board tight against the first one as shown Secure with 8 x 2 deck screws Repeat for other side mirroring boards Items for STEP 32 4 B...

Страница 30: ...x 60 Predrill Z holes Secure using 8 x 2Z x deck screws Items for STEP 33 Remove the B v x 6 x 21Z x board from the front of Flower Box Save the 8 x 2 deck screws Remove board FLOWER BOX Items for ST...

Страница 31: ...hased separately will work well for this project 3 Test stencil your name or message on a piece of paper Draw a bottom guideline on the paper Stencil one letter at a time starting with the first lette...

Страница 32: ...ground is too hard to screw in the anchors or you are having trouble lining up anchor with existing hole in tower you can remove the earth with a shovel Install the anchors and compact the earth as yo...

Страница 33: ...ble or Elevated Surface as a Straight Edge Fold Here Using a Table or Elevated Surface as a Straight Edge DESIGN A PLAQUE Items for STEP 38 1 Design a Plaque 4 8 x 1 truss head screws Plaque can be in...

Страница 34: ...p of the anchor will be flat against the back surface of Slide when the Slide is in the final position Reinstall Slide permanently attaching it to play deck using 14 x 1 pan head screws provided Use t...

Страница 35: ...of all other rides or stationary objects Fig 1 front view CLIMBING ROPE 1 Tie five knots equally spaced for climbing grips Fig 1 2 Insert rope through top hole and tie a knot with 4 remaining 3 Insert...

Страница 36: ...53547 Protected by one or more of the following United States or Foreign Patents US D418 189 US D409 708 US D424 154 US D428 637 US 6 402 663 US D422 332 US D410 059 US 6 068 557 US 6 302 801 US 6 482...

Отзывы: