Items for this STEP:
(12) #8 x 1
¹⁄₄
" deck screws
(2)
³⁄₈
" x 3" lag screw
(4)
³⁄₈
" x 2" hex bolts
(4)
³⁄₈
" lock nuts
(6)
³⁄₈
" washers
TRADITION with Tunnel Kit Only
22
Go to page 31 for
anchoring instructions.
88”
2" x 4
" x
46
³⁄₄
"
Dig into the ground 10
¹⁄₂
" so top bars
are leveled.
Attach Slide
here.
Under NO circumstances
attach slide here.
Remove slide.
Reattach slide to tunnel deck. Follow instructions provided with your
slide.
If using Climbing Bars from tower, remove them at this time. Attach
Vertical Climber or Climbing Steps to replace the bars. Refer to
instructions provided with your climbing component.
Attach Climbing Bar Assembly
Lift Climbing Bar Assembly into an upright position at
the dimension shown.
Dig into the ground 10
¹⁄₂
" at the base so the top bars
are leveled.
Use the brackets as a drill guide and drill
¹₈
" holes 1"
deep into the boards. Attach with #8 x 1
¹₄
" deck screws.
Drill a
³⁄₈
" hole completely through the board. Secure
with
³⁄₈
" x 2" hex bolt,
³⁄₈
" washer and
³⁄₈
" lock nut.
Attach Corner Brackets
Position brackets so that the short sides are against the 2" x 4" x 46
³⁄₄
" board as
shown.
Use the brackets as a drill guide and drill
¹₈
" holes 1" deep into the boards.
Attach with #8 x 1
¹₄
" deck screws.
Use the brackets as a drill guide and drill
¹₄
" holes 2
¹⁄₂
" deep through the
long
side and a
³⁄₈
" hole completely through the
short
side of the bracket. Secure the
long
side with
³⁄₈
" x 3" lag screw and
³⁄₈
" washer. Secure the
short
side with
³⁄₈
"
x 2" hext bolt,
³⁄₈
" washer and
³⁄₈
" lock nut.
Go to page 29 for instructions to reattach Climbing Bars.
Attach brackets here
inside tower.
Ground
LT 6456 Climbing Bar Instructions_AS Instructions '04 R1 2/24/10 3:04 PM Page 22