31
ANCHORING
At locations shown screw Playset Anchors into ground by hand (a long screwdriver will help).
Use the anchor as a drill guide and drill a
¹⁄₄
" hole 1" deep into the board. Attach with
³₈
" x 1
¹⁄₂
" lag screw and
³₈
" washer.
Gold Option
(6) Anchors
(6)
³⁄₈
"
x 1
¹⁄₂
"
Lag Screw
(6)
³⁄₈
"
Washers
Note: If soil conditions permit anchors to be pulled out easily, such as in sandy soil
conditions, cementing is required. If your ground is too hard to screw in the
anchors, or you are having trouble lining up anchor with existing hole in tower,
you can remove the earth with a shovel. Install the anchors and compact the
earth as you replace it. Anchors must be placed below the level of the shock-
absorbing surfacing material to prevent tripping or injury resulting from a fall.
Reminder: Be sure to install proper shock-absorbing surfacing material. Refer to the
Safety Guide at the beginning of this plan.
1
2
3
4
5
6
Содержание LEGACY PS 73161
Страница 21: ...21 This page Left Intentioanally Blank ...
Страница 22: ...22 Drill hole TAPE HERE TO ROOF ...
Страница 23: ...Accent Dormer Template cut out used in Step 1 on Page 33 TAPE HERE TO ROOF 23 Drill hole ...
Страница 24: ...24 This page Left Intentioanally Blank ...
Страница 35: ...35 Cupola Template cut out used in Step 1 on Page 34 ...
Страница 36: ...36 This page Left Intentioanally Blank ...