L
1: LINE UP THE HOLES OF THE IRON DUCTILE SWING HANGERS WITH THE HOLES IN THE SWING BEAM. IF YOUR BEAM
IS BOWED SLIGHTLY PLACE THE BOW SIDE UP; THE SWING HANGERS WILL BE ON THE BOTTOM.
2: FASTEN EACH SWING HANGER TO THE SWING BEAM USING 7" CARRIAGE BOLTS WITH TORQUE WASHERS, AND
3/8" WASHERS WITH 3/8" LOCK NUTS.
3: PLACE BOLT CAPS OVER EXPOSED THREADS.
STEP 2
8
: IRON DUCTILE SWING HANGERS
7" CARRIAGE BOLT
3/8" LOCK NUT
TORQUE WASHER
3/8" WASHER
BOLT CAPS
IRON DUCTILE
SWING HANGER
58
Содержание Redbrook with Monkey Bars 382
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 11: ...Model 382 BOXES 380 1 380 2 320 382 SLIDE BOX REV 3 20 2017 Timber Shield Post Option BOXES 380 1100...
Страница 37: ...1 1 DESCRIPTION PICTURE QTY ROPE DUCTILE SWING TELESCOPE 07 0001 11 4012 HANGERS IRON 10 ROCK WALL 6 27...
Страница 38: ...DESCRIPTION PICTURE QTY PAIR CLIP 07 0005 SPRING 11 5013 BRACKET GREEN 11 4003 4 6 90 SAFETY HANDLES 1pr 28...
Страница 94: ...APPENDIX 84...
Страница 96: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY...
Страница 98: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2...