STEP #8:
1. PLACE THE 2 X 4 X 70” CENTER DECK SUPPORTS FLUSH
AGAINST THE CENTER POSTS, ON TOP OF THE BLOCK
SUPPORTS. MAKE SURE THE OFFSET HOLES ON ONE
CENTER DECK SUPPORT ARE UP AND THE OTHER OFFSET
HOLES ARE DOWN. FASTEN THE CENTER DECK SUPPORTS
TO THE CENTER POSTS AND TIRE SWING BEAM WITH FOUR
3 ½” LAG BOLTS WITH 3/8” WASHERS PER SIDE.