STEP #20:
1. ATTACH THE FOUR 2 X 4 X 70” STEPS TO THE MIDDLE
CORNER POST AND CENTER POST. PLACE THE FIRST STEP
FLUSH WITH THE TOP OF THE UPPER DECK.
2. ATTACH THE STEP WITH THREE 3/8 X 3” LAG BOLTS.
3. USE A 2 X 4 AS A SPACER TO POSITION THE REMAINING
THREE STEPS.