Installation and user guide PLATINUM
®
inverter 5500 R3-S2, 7000 R3-S2, 8000 R3-S2, 9000 R3-S2
No.
Meaning
Measure
Blocking errors
1000
...
1020
Blocking system error
▪
Isolate the inverter from the mains and
DC generator
▪
Put inverter back into operation
If measures prove unsuccessful:
▪
Inform service
1060
...
1290
Blocking system error
▪
Isolate the inverter from the mains and
DC generator
▪
Put inverter back into operation
If measures prove unsuccessful:
▪
Inform service
1310
...
1990
System error
▪
Isolate the inverter from the mains and
DC generator
▪
Put inverter back into operation
If measures prove unsuccessful:
▪
Inform service
Non-blocking errors
2010
Amplitude limit for feed-in phase
exceeded or undershot
▪
Arrange for voltage amplitude of feed-
in phase to be checked
2020
...
2040
Grid amplitude error phase-to-
phase voltage
▪
Ensure that all safety devices are
switched on
▪
Ensure that all three phases are con-
nected
2080
Network fault on feed-in phase
(voltage peak)
If this occurs frequently:
▪
Arrange for all contacts and safety de-
vices to be checked, from the service
connection to the inverter
▪
Arrange for the network quality to be
checked
No.
Meaning
Measure
2100
2110
Mains frequency limit exceeded
or undershot
If the inverter is supplied with emergency
power from a different mains frequency:
▪
No measures required
41
Errors and troubleshooting