![Platinum 5500 R3-S2B Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/platinum/5500-r3-s2b/5500-r3-s2b_user-and-installation-manual_1566098026.webp)
Installation and user guide PLATINUM
®
inverter 5500 R3-S2, 7000 R3-S2, 8000 R3-S2, 9000 R3-S2
5.2 Operation display
I
During normal operation, the operating mode is displayed. The power data is shown in
a table and graph. In this way, the operation display provides an overview of the feed-
in process and the yield of the PV system.
5.2.1 Navigating in the TODAY operation display
/
buttons
Switch between screen 1 and 2 (TODAY) and ACTUAL operation
display.
/
buttons
Switch between time periods (TODAY)
or between ACTUAL 1 and ACTUAL 2
5.2.2 TODAY operation display
The TODAY operation display is divided between two screens that can be displayed for
different time periods.
Screen 1: Absolute power data
1
2
3
4
5
(1)
Current power
(2)
Total energy fed in today
(3)
Total feed-in rebate generated today
(4)
Total CO
2
saved today
(5)
Feed-in progress today
Screen 2: Standardised power data (if configured)
6
7
(6)
Standardised yield generated for the
period displayed; in the example:
yield generated today
(7)
Maximum standardised power
achieved today
26
Operation