Installation | Assembly Instructions
52
Cooling Pad | Installation and Operation Guide Rev B | Doc P/N: 080205039E
Step 13: Connecting Pump/Filter Assembly to System
41
53
1.
Attach the 90° elbow (29)
to the distribution pipe
3.
and attach
the threaded nut valve (53)
to the straight adaptor
2.
Insert a straight adaptor (41)
into the reservoir channel end and
thread the washer onto the adaptor
29
41
WWW