Installation | Assembly Instructions
32
Cooling Pad | Installation and Operation Guide Rev B | Doc P/N: 080205039E
4
65 mm
5
4
37
37
4
4.
Fill the contact
grooves with adhesive
6.
Fill the contact
grooves with adhesive
3.
Drill a 51 mm hole in the
reservoir channel end (4)
that is placed on the pump
side of the channel
5
37
6.
Attach the two reservoir
channel ends (4, 37) to two
channel sections (5)
5.
Verify the prefabricated hole
of the reservoir channel end (37)
that is placed on the other side of
the channel is free of burrs
Pump side
WWW